Back-Calculation Method of Rock Mass Pressure in a Shallow-Buried Super Large-Span Tunnel Using Upper-Bench CD Method

被引:0
|
作者
Yanbin Luo
Yunfei Wu
Jianxun Chen
Fangfang Dong
Weiwei Liu
Lijun Chen
Yao Li
Zhou Shi
机构
[1] Chang’an University,School of Highway
[2] Chang’an University,School of Highway, Key Laboratory for Bridge and Tunnel of Shaanxi Province
来源
关键词
Tunnel engineering; Super large-span tunnel; Upper-bench CD method; Rock mass pressure; Load release;
D O I
暂无
中图分类号
学科分类号
摘要
Rock mass pressure has always been a research hotspot in the field of tunnel engineering, especially in the super large-span tunnel, which is characterized by flat section, large excavation span, and complex stress field. Based on the Letuan Tunnel (a bi-directional tunnel with eight traffic lanes) of Binlai expressway expansion project in Shandong Province, China, this paper focused on the calculation method of rock mass pressure and the evolution law of load release in the construction process of the super large-span tunnel excavated by upper-bench central diaphragm (CD) method. Based on field measured data of Letuan Tunnel, the deformation behavior of primary lining and the distribution state of rock mass pressure during the tunnel construction were analyzed. According to the bearing mode of supporting structure, the mechanical models of different construction stages were established. Then, the rock mass pressures in different construction stages were back-calculated using mechanical models and compared with the measured values, and the evolution law of load release during the tunnel construction was discussed. The study results show that the tunnel deformation and rock mass pressure were significantly affected by the construction process and support form, and the excavation span was the key factor affecting the stability of rock mass. For the shallow-buried super large-span tunnel constructed by upper-bench CD method, the primary support of upper bench was under eccentric pressure. The comparison between the back-calculated value and the field measured value indicated that they were similar, and the average relative error was 17.23%. According to the concept of load release coefficient proposed in this paper, the load release coefficient after the pilot tunnel ahead (Part I) excavation reached 63%, and the load release coefficient after the pilot tunnel behind excavation (Part II) was 37%, which means that the rock mass pressure of Part I is increased about 59% due to the excavation of Part II.
引用
收藏
页码:433 / 447
页数:14
相关论文
共 32 条
  • [1] Back-Calculation Method of Rock Mass Pressure in a Shallow-Buried Super Large-Span Tunnel Using Upper-Bench CD Method
    Luo, Yanbin
    Wu, Yunfei
    Chen, Jianxun
    Dong, Fangfang
    Liu, Weiwei
    Chen, Lijun
    Li, Yao
    Shi, Zhou
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 26 (1) : 433 - 447
  • [2] Application of the Upper-Bench CD Method in Super Large-Span and Shallow Tunnel: A Case Study of Letuan Tunnel
    Chen, Jianxun
    Xu, Zilong
    Luo, Yanbin
    Song, Jiakang
    Liu, Weiwei
    Dong, Fangfang
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [3] Research and Application of Active Support Mechanism for Shallow-Buried Large-Span Rock Tunnel
    Wang S.
    Mei Y.
    Liu Q.
    Li W.
    Yin X.
    Wang G.
    Li W.
    Wang X.
    Qin Z.
    Yang X.
    Feng Q.
    Zhang S.
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (01): : 131 - 141
  • [4] Finite element inversion computation for surrounding rock mass parameters of large-span shallow-buried highway tunnel
    Yin, Zhizheng
    Zhang, Jiasheng
    MODELING AND COMPUTATION IN ENGINEERING II, 2013, : 149 - 155
  • [5] Support mechanism and effect analysis of an umbrella arch in a super shallow-buried large-span tunnel
    Zhao, Jinpeng
    Tan, Zhongsheng
    Liang, Wenguang
    Gao, Junpeng
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2021, 54 : 87 - 96
  • [6] Stability control of ultra shallow-buried metro tunnel with super large-span in process of crossing bridge
    Li, Dong
    He, Xingling
    Qin, Le
    Kang, Yong
    Zhou, Dongping
    Guo, Chenye
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2013, 32 (SUPPL.2): : 3636 - 3642
  • [7] Deformation monitoring and its control in a shallow-buried large-span tunnel constructed using the pile-beam-arch method
    Qu, Wan-Bo
    Liu, Xin-Rong
    Huang, Rui-Jin
    Liu, Ming-Zhong
    Tumu Jianzhu yu Huanjing Gongcheng/Journal of Civil, Architectural and Environmental Engineering, 2009, 31 (01): : 38 - 43
  • [8] Research on influencing factors and recognition method for loose zone around shallow-buried large-span unlined tunnel in heavily jointed rock stratum
    Wang, Zhiwei
    Qiao, Chunsheng
    Song, Chaoye
    ROCK CHARACTERISATION, MODELLING AND ENGINEERING DESIGN METHODS, 2013, : 567 - 572
  • [9] Model Test Research on Excavation Method of Large-span and Shallow-buried Bias Tunnel in Cobble and Gravelly Soil Layer
    Tang Jinsong
    Xiong Baolin
    Liu Chiguang
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 336 - 343
  • [10] Study on the geological adaptability of the arch cover method for shallow-buried large-span metro stations
    Lei, Mingfeng
    Zhao, Chenyang
    Jia, Chaojun
    Shi, Chenghua
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 132