共 50 条
- [7] A decision support flexible scheduling system for continuous galvanization lines using genetic algorithm [J]. PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2019, 13 (01): : 43 - 52
- [8] A decision support flexible scheduling system for continuous galvanization lines using genetic algorithm [J]. Production Engineering, 2019, 13 : 43 - 52
- [9] Automated sidescan sonar pipe inspection [J]. 2000, Institute of Marine Engineering, Science and Technology (08):
- [10] Image Mosaicing for Automated Pipe Scanning [J]. 41ST ANNUAL REVIEW OF PROGRESS IN QUANTITATIVE NONDESTRUCTIVE EVALUATION, VOL 34, 2015, 1650 : 1334 - 1342