A note on the selection of priority rules in software packages for project management

被引:0
|
作者
Philipp Baumann
Norbert Trautmann
机构
[1] University of Bern,
关键词
Project scheduling; Software; Priority rules; Experimental analysis;
D O I
暂无
中图分类号
学科分类号
摘要
Various software packages for project management include a procedure for resource-constrained scheduling. In several packages, the user can influence this procedure by selecting a priority rule. However, the resource-allocation methods that are implemented in the procedures are proprietary information; therefore, the question of how the priority-rule selection impacts the performance of the procedures arises. We experimentally evaluate the resource-allocation methods of eight recent software packages using the 600 instances of the PSPLIB J120 test set. The results of our analysis indicate that applying the default rule tends to outperform a randomly selected rule, whereas applying two randomly selected rules tends to outperform the default rule. Applying a small set of more than two rules further improves the project durations considerably. However, a large number of rules must be applied to obtain the best possible project durations.
引用
收藏
页码:694 / 702
页数:8
相关论文
共 50 条