Dual inexact fuzzy chance-constrained programming for planning waste management systems

被引:0
|
作者
M. F. Cao
G. H. Huang
Y. Sun
Y. Xu
Y. Yao
机构
[1] North China Electric Power University,Sino
[2] University of Regina,Canada Center of Energy and Environmental Research
关键词
Dual uncertainties; Environment; Joint probability distribution; Decision support; Optimization; Solid waste;
D O I
暂无
中图分类号
学科分类号
摘要
This study develops a dual inexact fuzzy chance-constrained programming (DIFCCP) method for planning municipal solid waste (MSW) management systems. The concept of random boundary interval (RBI) is introduced to address the high uncertain parameters in the studied system. Fuzzy flexible programming and chance-constrained programming are also introduced to take into account the uncertainties of RBIs and various uncertainties in MSW management system. Compared with the existing methods, the developed method could deal with the uncertainty without simplification and thus is more robust. Moreover, the potential system-failure risks in MSW management system due to the existing uncertainties could be quantified by means of violation levels and satisfaction levels in DIFCCP. The developed method then is applied to a MSW management system. The obtained solutions could be used for generating efficient management schemes. The values of violation and satisfaction levels could help decision makers understand the tradeoffs between system cost and system-failure risk, and identify desired strategy according to the practical economic and environmental situation.
引用
收藏
页码:1163 / 1174
页数:11
相关论文
共 50 条
  • [1] Dual inexact fuzzy chance-constrained programming for planning waste management systems
    Cao, M. F.
    Huang, G. H.
    Sun, Y.
    Xu, Y.
    Yao, Y.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2010, 24 (08) : 1163 - 1174
  • [2] Inexact Fuzzy Chance-Constrained Fractional Programming for Sustainable Management of Electric Power Systems
    Zhou, C. Y.
    Huang, G. H.
    Chen, J. P.
    Zhang, X. Y.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [3] ITCLP: An inexact two-stage chance-constrained program for planning waste management systems
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Qin, X. S.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2007, 49 (03) : 284 - 307
  • [4] Inexact fuzzy chance-constrained programming for community-scale urban stormwater management
    Cai, Yanpeng
    Lin, Xuan
    Yue, Wencong
    Zhang, Pingping
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 182 : 937 - 945
  • [5] An inexact inventory-theory-based chance-constrained programming model for solid waste management
    XiuJuan Chen
    GuoHe Huang
    MeiQin Suo
    Hua Zhu
    Cong Dong
    [J]. Stochastic Environmental Research and Risk Assessment, 2014, 28 : 1939 - 1955
  • [6] An inexact inventory-theory-based chance-constrained programming model for solid waste management
    Chen, XiuJuan
    Huang, GuoHe
    Suo, MeiQin
    Zhu, Hua
    Dong, Cong
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (08) : 1939 - 1955
  • [7] ICQSWM: An inexact chance-constrained quadratic solid waste management model
    Sun, Y.
    Huang, G. H.
    Li, Y. P.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2010, 54 (10) : 641 - 657
  • [8] Inexact nonlinear improved fuzzy chance-constrained programming model for irrigation water management under uncertainty
    Zhang, Chenglong
    Zhang, Fan
    Guo, Shanshan
    Liu, Xiao
    Guo, Ping
    [J]. JOURNAL OF HYDROLOGY, 2018, 556 : 397 - 408
  • [9] Fuzzy random chance-constrained programming
    Liu, BD
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2001, 9 (05) : 713 - 720
  • [10] An Inexact Chance-constrained Quadratic Programming Model for Stream Water Quality Management
    X. S. Qin
    G. H. Huang
    [J]. Water Resources Management, 2009, 23 : 661 - 695