共 50 条
- [2] DOUBLE SHIELD TBM IN CHALLENGING, DIFFICULT GROUND CONDITIONS-A CASE STUDY FROM ZAGROS LONG WATER TRANSFER TUNNEL, IRAN [J]. 2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1321 - +
- [5] Effect of Clogging on EPB TBM Performance: A Case Study in Akfirat Waste Water Tunnel, Turkey [J]. Geotechnical and Geological Engineering, 2019, 37 : 4789 - 4801
- [7] Risk analysis of double shield TBM construction accident induced by tunnel deformation [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 3060 - 3065