Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey

被引:0
|
作者
Aydin Shaterpour-Mamaghani
Deniz Tumac
Emre Avunduk
机构
[1] Istanbul Technical University,Mining Engineering Department
关键词
TBM; Tunnel excavation; Machine utilization time; Excavation performance;
D O I
暂无
中图分类号
学科分类号
摘要
The performance analysis of double shield TBMs in difficult ground conditions in the Gerede tunnel is presented in this study. The strength of the encountered formations along the tunnel route varied from medium strength (sandstone, limestone) to high strength (basalt). The total length of tunnels is 31.6 km, which was excavated by three double shield TBMs having diameter of 5.57 m. Literature studies are first carried out in order to review the difficult ground conditions and their impacts on mechanized tunnelling. Later, the project, geology, and the characteristics of the TBMs are given in detail. Then the factors affecting the performance of the TBMs, machine utilization, and operational parameters (torque, thrust) are discussed in detail. In the light of these facts, the main objective of this study is to describe the possible improvement methods to reduce the effect of these difficulties on TBM performance.
引用
收藏
页码:251 / 262
页数:11
相关论文
共 50 条
  • [1] Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey
    Shaterpour-Mamaghani, Aydin
    Tumac, Deniz
    Avunduk, Emre
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2016, 75 (01) : 251 - 262
  • [2] DOUBLE SHIELD TBM IN CHALLENGING, DIFFICULT GROUND CONDITIONS-A CASE STUDY FROM ZAGROS LONG WATER TRANSFER TUNNEL, IRAN
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rostami, Jamal
    [J]. 2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1321 - +
  • [3] An appraisal of TBM performances in Turkey in difficult ground conditions and some recommendations
    Bilgin, Nuh
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 265 - 276
  • [4] Effect of Clogging on EPB TBM Performance: A Case Study in Akfirat Waste Water Tunnel, Turkey
    Avunduk, E.
    Copur, H.
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (06) : 4789 - 4801
  • [5] Effect of Clogging on EPB TBM Performance: A Case Study in Akfirat Waste Water Tunnel, Turkey
    E. Avunduk
    H. Copur
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 4789 - 4801
  • [6] Tunnelling in difficult ground: a case study from Dranaz tunnel, Sinop, Turkey
    Aydin, A
    Ozbek, A
    Cobanoglu, I
    [J]. ENGINEERING GEOLOGY, 2004, 74 (3-4) : 293 - 301
  • [7] Risk analysis of double shield TBM construction accident induced by tunnel deformation
    Wen, Sen
    Xu, Weiya
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 3060 - 3065
  • [8] Rescue technology of the jamming accident for the double-shield TBM in complex geological conditions: A case study
    Cui, Guangyao
    Ke, Xu
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2023, 79 : 374 - 389
  • [9] Causes of reduction in shield TBM performance - A case study in Seoul
    Jung, Hyuk-Sang
    Choi, Jung-Myung
    Chun, Byung-Sik
    Park, Jong-Sik
    Lee, Yong-Joo
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (03) : 453 - 461
  • [10] Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions
    Bilgin, Nuh
    Copur, Hanifi
    Balci, Cemal
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 27 (01) : 41 - 51