Application of Fixed Length Gene Genetic Programming (FLGGP) in Hydropower Reservoir Operation

被引:0
|
作者
Habib Akbari-Alashti
Omid Bozorg Haddad
Miguel A. Mariño
机构
[1] University of Tehran,Department of Irrigation & Reclamation Engineering, Faculty of Agricultural Engineering & Technology, College of Agriculture & Natural Resources
[2] University of California,Department of Land, Air & Water Resources, Department of Civil & Environmental Engineering
[3] University of California,Department of Biological & Agricultural Engineering
来源
关键词
Genetic programming (GP); Fixed length gene genetic programming (FLGGP); Genetic algorithm (GA); Nonlinear programming (NLP); Static and dynamic operation rules;
D O I
暂无
中图分类号
学科分类号
摘要
This paper develops a new method for real-time operation of reservoir systems. Genetic programming (GP) and a developed fixed length gene GP (FLGGP) are applied and compared in two approaches of static and dynamic operation rules with the aim of hydroelectric supply of Karun3 reservoir in Iran. Results are compared with those of genetic algorithm (GA) and nonlinear programming (NLP) method, indicating that GP and FLGGP have a higher efficiency (on average, 5 %) than GA and NLP operation methods. In addition, results showed that the FLGGP method is a powerful and efficient tool without the limitations of GP and can be used as a suitable replacement to GP. Comparison of two approaches of static and dynamic operation rules demonstrated the superiority of dynamic operation rules and this approach has an average superiority of 10 % to static operation rules in all methods.
引用
收藏
页码:3357 / 3370
页数:13
相关论文
共 50 条
  • [1] Application of Fixed Length Gene Genetic Programming (FLGGP) in Hydropower Reservoir Operation
    Akbari-Alashti, Habib
    Bozorg-Haddad, Omid
    Marino, Miguel A.
    [J]. WATER RESOURCES MANAGEMENT, 2015, 29 (09) : 3357 - 3370
  • [2] Improved Dynamic Programming for Hydropower Reservoir Operation
    Zhao, Tongtiegang
    Zhao, Jianshi
    Yang, Dawen
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (03) : 365 - 374
  • [3] The Hydropower Station Output Function and its Application in Reservoir Operation
    Li Chuangang
    Ji Changming
    Wang Boquan
    Liu Minghao
    Li Rongbo
    [J]. WATER RESOURCES MANAGEMENT, 2017, 31 (01) : 159 - 172
  • [4] The Hydropower Station Output Function and its Application in Reservoir Operation
    Li Chuangang
    Ji Changming
    Wang Boquan
    Liu Minghao
    Li Rongbo
    [J]. Water Resources Management, 2017, 31 : 159 - 172
  • [5] Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos
    Cheng, Chun-Tian
    Wang, Wen-Chuan
    Xu, Dong-Mei
    Chau, K. W.
    [J]. WATER RESOURCES MANAGEMENT, 2008, 22 (07) : 895 - 909
  • [6] Optimizing Hydropower Reservoir Operation Using Hybrid Genetic Algorithm and Chaos
    Chun-Tian Cheng
    Wen-Chuan Wang
    Dong-Mei Xu
    K. W. Chau
    [J]. Water Resources Management, 2008, 22 : 895 - 909
  • [7] A LSTM-based approximate dynamic programming method for hydropower reservoir operation optimization
    Feng, Zhong-kai
    Luo, Tao
    Niu, Wen-jing
    Yang, Tao
    Wang, Wen-chuan
    [J]. JOURNAL OF HYDROLOGY, 2023, 625
  • [8] Optimal Reservoir Operation for Hydropower Generation using Non-linear Programming Model
    Arunkumar R.
    Jothiprakash V.
    [J]. Journal of The Institution of Engineers (India): Series A, 2012, 93 (2) : 111 - 120
  • [9] Optimization of Exclusive Release Policies for Hydropower Reservoir Operation by Using Genetic Algorithm
    Aida Tayebiyan
    Thamer Ahmed Mohammed Ali
    Abdul Halim Ghazali
    M. A. Malek
    [J]. Water Resources Management, 2016, 30 : 1203 - 1216
  • [10] Optimization of Exclusive Release Policies for Hydropower Reservoir Operation by Using Genetic Algorithm
    Tayebiyan, Aida
    Ali, Thamer Ahmed Mohammed
    Ghazali, Abdul Halim
    Malek, M. A.
    [J]. WATER RESOURCES MANAGEMENT, 2016, 30 (03) : 1203 - 1216