Coiled Tubing Erosion Prediction and Fracturing Fluid Parameters Optimization During Hydraulic Jet Fracturing

被引:0
|
作者
Airong Xu
Yihua Dou
Changxing Feng
Jie Zheng
Xianke Cui
机构
[1] Xi’an Shiyou University,Mechanical Engineering College
[2] Key Laboratory for Integrity Evaluation of Complex Oil & Gas Well of Xi’an,undefined
[3] Sinopec Shanghai Petrochemical Co.,undefined
[4] Ltd.,undefined
关键词
Coiled tubing; Erosion; Discrete phase model; Fracturing fluid parameters; Optimization analysis;
D O I
暂无
中图分类号
学科分类号
摘要
The erosion wear of coiled tubing wound on the drum by fracturing fluid gravel greatly affects its service life and the operation safety during hydraulic jet fracturing operation in oilfield applications. Based on computational fluid dynamics, discrete phase model and optimal design theory, this paper uses ANSYS workbench software to numerically simulate the erosion of 2.375″ coiled tubing wound on the drum by fracturing fluid. The simulation result shows that the coiled tubing erosion rate is most affected by fracturing fluid injection velocity. Gravel mass flow rate has less effect. Gravel diameter has the least effect. Coiled tubing erosion wear can be effectively controlled by optimal matching smaller fracturing fluid injection velocity and a certain range of gravel mass flow rate values. This research provides a new simulation method for accurately and efficiently predicting coiled tubing erosion and wear failure, and the results can provide some theoretical help for fracturing operations.
引用
收藏
页码:1276 / 1292
页数:16
相关论文
共 50 条
  • [1] Coiled Tubing Erosion Prediction and Fracturing Fluid Parameters Optimization During Hydraulic Jet Fracturing
    Xu, Airong
    Dou, Yihua
    Feng, Changxing
    Zheng, Jie
    Cui, Xianke
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2022, 22 (03) : 1276 - 1292
  • [2] Coiled tubing erosion during hydraulic fracturing slurry flow
    Shah, Subhash N.
    Jain, Samyak
    WEAR, 2008, 264 (3-4) : 279 - 290
  • [3] Numerical Simulation on Coiled Tubing Erosion During Hydraulic Fracturing
    Jia, Peng
    Zhu, Xiuxing
    Xue, Shifeng
    Fang, Jun
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2020, 20 (06) : 1928 - 1938
  • [4] Numerical Simulation on Coiled Tubing Erosion During Hydraulic Fracturing
    Peng Jia
    Xiuxing Zhu
    Shifeng Xue
    Jun Fang
    Journal of Failure Analysis and Prevention, 2020, 20 : 1928 - 1938
  • [5] An Experimental Investigation of Hydraulic Jet Fracturing Technology with Coiled Tubing
    He Huiqun Hu Qiangfa Zhu Feng(Drilling Research Institute of China National Petroleum Corporation)
    石油机械, 2012, (03) : 103 - 108
  • [6] Specific fluid requirements for successful coiled-tubing fracturing applications
    Cawiezel, Kay E.
    Wheeler, Richard S.
    Vaughn, David R.
    SPE PRODUCTION & OPERATIONS, 2007, 22 (01): : 83 - 93
  • [7] Proppant transport in foam fracturing fluid during hydraulic fracturing
    Tong, Songyang
    Gu, Ming
    Singh, Robin
    Mohanty, Kishore K.
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 182
  • [8] Coiled-tubing fracturing in the appalachian basin
    Stidham, J.E.
    Tetrick, L.T.
    Glenn, S.A.
    JPT, Journal of Petroleum Technology, 2002, 54 (07):
  • [9] Coiled-tubing fracturing in the Appalachian basin
    Bybee, K
    JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (07): : 45 - 45
  • [10] Temperature of rock formation and fracturing fluid during the hydraulic fracturing process
    Babenkov, M. B.
    FIFTH ALL-RUSSIAN CONFERENCE WITH INTERNATIONAL PARTICIPATION POLAR MECHANICS, 2018, 193