Characteristics-Based Framework of Effective Automated Monitoring Parameters in Construction Projects

被引:0
|
作者
Abdul Hannan Qureshi
Wesam Salah Alaloul
Wong Kai Wing
Syed Saad
Syed Ammad
Muhammad Altaf
机构
[1] Universiti Teknologi PETRONAS,Department of Civil and Environmental Engineering
关键词
Effective monitoring factors; Automated monitoring framework; Detection technologies; Exploratory factor analysis; Confirmatory factor analysis;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry is moving toward digitalization, and technologies support various construction processes. In the automated construction progress monitoring domain, several modern progress measurement techniques have been introduced. However, a hesitant attitude has been observed toward its adoption. Researchers have highlighted lack of theoretical understanding of effectual implementation is one of the significant reasons. This study aims to analyze general technological parameters related to automated monitoring technologies and devise a theoretical-based conceptual framework explaining the aspects affecting the adequate operation of automated monitoring. The study has been executed by following a systematic inline process for the identification of effective parameters, which include a structured literature review, semi-structured interviews, pilot survey, questionnaire survey, and structural equation modeling (SEM)-based mathematical model. A refined conceptual framework has been devised with 21 effective parameters under five significant categories, i.e., “Target Object,” “Technical,” “External Interference,” “Occlusions,” and “Sensing.” A knowledge framework has been established by adopting the SEM technique, which is designed on the characteristics-based theme. This conceptual framework provides the theoretical base for practitioners toward the conceptual understanding of automated monitoring processes related to technological parameters that affect the outcomes. This study is unique as it focused on the general criteria or parameters that affect the performance or outcomes of the digital monitoring process and is easily understandable by the user or operator.
引用
收藏
页码:4731 / 4749
页数:18
相关论文
共 50 条
  • [1] Characteristics-Based Framework of Effective Automated Monitoring Parameters in Construction Projects
    Qureshi, Abdul Hannan
    Alaloul, Wesam Salah
    Wing, Wong Kai
    Saad, Syed
    Ammad, Syed
    Altaf, Muhammad
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2023, 48 (04) : 4731 - 4749
  • [2] Characteristics-based effective applause detection for meeting speech
    Li, Yan-Xiong
    He, Qian-Hua
    Kwong, Sam
    Li, Tao
    Yang, Ji-Chen
    [J]. SIGNAL PROCESSING, 2009, 89 (08) : 1625 - 1633
  • [3] A semantic-based framework for automated rule checking in healthcare construction projects
    Soliman-Junior, Joao
    Formoso, Carlos T.
    Tzortzopoulos, Patricia
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (02) : 202 - 214
  • [4] Automated progress monitoring technological model for construction projects
    Qureshi, Abdul Hannan
    Alaloul, Wesam Salah
    Wing, Wong Kai
    Saad, Syed
    Musarat, Muhammad Ali
    Ammad, Syed
    Kineber, Ahmed Farouk
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (10)
  • [5] A Framework to Enhance Utilization of Automated Progress Measurements in Construction Projects
    Asl, Negar Mansouri
    Hammad, Ahmed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: COMPUTER APPLICATIONS, AUTOMATION, AND DATA ANALYTICS, 2022, : 651 - 660
  • [6] A study of automated intelligent monitoring of scaffolding safety for construction projects
    Chuang, Kun-Yen
    Tserng, Hui-Ping
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2024, 47 (06) : 626 - 642
  • [7] Automated monitoring technologies and construction productivity enhancement: Building projects case
    Alzubi, Khalid Mhmoud
    Alaloul, Wesam Salah
    Malkawi, Ahmad B.
    Al Salaheen, Marsail
    Qureshi, Abdul Hannan
    Musarat, Muhammad Ali
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (08)
  • [8] A framework for an automated and integrated project monitoring and control system for steel fabrication projects
    Azimi, Reza
    Lee, SangHyun
    AbouRizk, Simaan M.
    Alvanchi, Amin
    [J]. AUTOMATION IN CONSTRUCTION, 2011, 20 (01) : 88 - 97
  • [9] An effective automated ontology construction based on the agriculture domain
    Deepa, Rajendran
    Vigneshwari, Srinivasan
    [J]. ETRI JOURNAL, 2022, 44 (04) : 573 - 587
  • [10] Towards a framework of automated resource model for post contract cost control of construction projects
    Igwe, Uchenna Sampson
    Mohamed, Sarajul Fikri
    Dzahir, Mohd Azwarie Mat
    Yusof, Zakaria Mohd
    Khiyon, Noor Azeyah
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (16) : 3088 - 3097