Risk-Based Two-Stage Stochastic Model for Optimal Scheduling Problem of an Energy Hub in Day-Ahead and Real-Time Energy Market for Improve Reliability

被引:0
|
作者
Moghadam, Maziyar Balali [1 ]
Shamim, Ahmad Ghaderi [1 ]
Samaei, Farhad [1 ]
机构
[1] Islamic Azad Univ, Dept Elect Engn, Hamedan Branch, Hamadan, Iran
关键词
Energy hub; Flexible reliability; Short-term operation; PHEV; Real-time market;
D O I
10.1007/s40866-023-00187-w
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Supplying local electrical and heat demands through the energy hub (EH) system and renewable sources such as photovoltaic (PV) can increase the reliability system. The EH includes combined heat and power units, PV arrays, and storage units and it can trade energy with the wholesale energy markets. The EH operator (EHO) purchases the required energy from the day-ahead market regarding the forecasted amount of demand and the output power of PV system. Then, the EHO can trade energy with the real-time energy markets regarding the uncertainties of PVs and real-time energy prices to minimize its total operation cost. Although the EHO needs to determine the optimal scheduling of its resources considering the participation in the both DA and RT energy markets, this problem is yet needs to the appropriate models. Therefore, a risk-based two-stage stochastic optimization problem is proposed in this paper to model the decision making problem of the reliability EHO in the DA and RT energy markets considering the uncertainties. For this purpose, the uncertainties of PV system and RT energy prices are modeled using the two-stage stochastic approach where the risk of EHO's decisions is managed using Tail-Value-at-Risk (TVaR). The results show that with increasing the risk parameters, the EHO increases the purchased power from the DA market as the first-stage decision regarding which the trading energy with RT market decreases. Therefore, an energy at a reasonable price and with high reliability is provided to energy hub.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Two-stage stochastic programming for risk-aware scheduling of energy hubs participating in day-ahead and real-time electricity markets
    Jordehi, A. Rezaee
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2022, 81
  • [2] An optimal approach for coordinating scheduling day-ahead and real-time energy market with risks
    Liu, Bo
    Zhou, Ming
    Li, Gengyin
    [J]. 2006 INTERNATIONAL CONFERENCE ON POWER SYSTEMS TECHNOLOGY: POWERCON, VOLS 1- 6, 2006, : 1775 - +
  • [3] A risk-based optimal self-scheduling of smart energy hub in the day-ahead and regulation markets
    Najaji, Arsalan
    Tavakoli, Ahmad
    Pourakbari-Kasmaei, Mahdi
    Lehtonen, Matti
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 279
  • [4] A two-stage optimal scheduling strategy of hybrid energy system integrated day-ahead electricity market
    Singh, Nitesh Kumar
    Koley, Chaitali
    Gope, Sadhan
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT, 2024, 23 (2-3) : 231 - 250
  • [5] Stochastic energy scheduling in microgrid with real-time and day-ahead markets in the presence of renewable energy resources
    Tao Hai
    Jincheng Zhou
    Mohsen Latifi
    [J]. Soft Computing, 2023, 27 : 16881 - 16896
  • [6] Stochastic energy scheduling in microgrid with real-time and day-ahead markets in the presence of renewable energy resources
    Hai, Tao
    Zhou, Jincheng
    Latifi, Mohsen
    [J]. SOFT COMPUTING, 2023, 27 (22) : 16881 - 16896
  • [7] Two-stage Stochastic Day-ahead Optimal Resource Scheduling in a Distribution Network with Intensive Use of Distributed Energy Resources
    Sousa, Tiago
    Ghazvini, Mohammad Ali Fotouhi
    Morais, Hugo
    Castro, Rui
    Vale, Zita
    [J]. 2015 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES LATIN AMERICA (ISGT LATAM), 2015, : 689 - 694
  • [8] Two-stage stochastic operation considering day-ahead and real-time scheduling of microgrids with high renewable energy sources and electric vehicles based on multi-layer energy management system
    Azarhooshang, Alireza
    Sedighizadeh, Davoud
    Sedighizadeh, Mostafa
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2021, 201
  • [9] A two-stage stochastic programming framework for risk-based day-ahead operation of a virtual power plant
    Emarati, Mohammadreza
    Keynia, Farshid
    Rashidinejad, Masoud
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (03)
  • [10] Two-Stage Participation of Grid-Connected Energy Hubs in Day-Ahead and Real-Time Energy Markets Based on Robust Modeling of Uncertainties
    Nafehfeshan, Mohammad Jafar
    Bahmani-Firouzi, Bahman
    Nafar, Mehdi
    [J]. INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2023, 2023