Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application

被引:0
|
作者
Heeyoung Chung
In-Mo Lee
Jee-Hee Jung
Jeongjun Park
机构
[1] Korea University,School of Civil, Environmental and Architectural Engineering
[2] Korea Railroad Research Institute,Advanced Infrastructure Research Team
来源
关键词
Shield Tunnel Boring Machine (TBM); risk analysis model; degree of risk; Bayesian networks; risk management methodology;
D O I
暂无
中图分类号
学科分类号
摘要
A risk management methodology that can be applicable to a shield Tunnel Boring Machine (TBM) tunneling project is proposed in this paper. A Shield TBM Risk Analysis Model (STRAM) is developed based on Bayesian networks. STRAM considers geological risk factors and TBM types, such as Earth Pressure Balance (EPB) open mode, EPB closed mode, and slurry TBMs, and systematically identifies the potential risk events that may occur during tunnel construction. It can also quantitatively evaluate the degree of risk for the identified potential risk events by estimating the cost of countermeasures against event occurrence. The proposed methodology based on STRAM can minimize the drawbacks of the TBM tunneling method, including difficulty in substituting the machine type once it is selected and excessive delay of the project due to unexpected risk events.
引用
收藏
页码:452 / 465
页数:13
相关论文
共 50 条
  • [1] Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application
    Chung, Heeyoung
    Lee, In-Mo
    Jung, Jee-Hee
    Park, Jeongjun
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 452 - 465
  • [2] Erratum to: Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application
    Heeyoung Chung
    In-Mo Lee
    Jee-Hee Jung
    Jeongjun Park
    [J]. KSCE Journal of Civil Engineering, 2019, 23 : 3735 - 3735
  • [3] Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application (vol 23, pg 452, 2019)
    Chung, Heeyoung
    Lee, In-Mo
    Jung, Jee-Hee
    Park, Jeongjun
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3735 - 3735
  • [4] Development and application of the new TBM risk management system
    Murakami, K.
    Murayama, M.
    Terada, K.
    Fuke, Y.
    Miyajima, Y.
    Aoki, K.
    [J]. UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1565 - 1571
  • [5] Application of Bayesian Networks in distribution system risk management
    Sand, K.
    Catrinu, M. D.
    Kjolle, G. H.
    Bonnoit, S.
    Aupied, J.
    [J]. 2008 10TH INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2008, : 75 - 82
  • [6] Risk assessment of TBM jamming based on Bayesian networks
    Lin, Peng
    Xiong, Yue
    Xu, Zhenhao
    Wang, Wenyang
    Shao, Ruiqi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2022, 81 (01)
  • [7] Risk assessment of TBM jamming based on Bayesian networks
    Peng Lin
    Yue Xiong
    Zhenhao Xu
    Wenyang Wang
    Ruiqi Shao
    [J]. Bulletin of Engineering Geology and the Environment, 2022, 81
  • [8] Development of a Bayesian networks-based early warning system for wave-induced flooding
    Garzon, J. L.
    Ferreira, O.
    Zozimo, A. C.
    Fortes, C. J. E. M.
    Pinheiro, L. V.
    Ferreira, A. M.
    Reis, M. T.
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2023, 96
  • [9] A Risk Assessment System for Hard Rock TBM Selection Based on Bayesian Belief Networks (BBN)
    Zhao, Feng
    Xue, Yadong
    Li, Yanjie
    Zhao, Hanxiang
    [J]. GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 454 - 467
  • [10] Bayesian Networks-Based Interval Training Guidance System for Cancer Rehabilitation
    Suh, Myung-kyung
    Lee, Kyujoong
    Heu, Alfred
    Nahapetian, Ani
    Sarrafzadeh, Majid
    [J]. MOBILE COMPUTING, APPLICATIONS AND SERVICES, 2010, 35 : 236 - 253