Experimental study with hydraulic modeling of a reservoir desilting operation using a sediment bypass tunnel

被引:0
|
作者
Cheng-Chia Huang
Hao-Che Ho
Jihn-Sung Lai
Fong-Zuo Lee
机构
[1] Feng Chia University,Department of Water Resources Engineering and Conservation
[2] National Taiwan University,Department of Civil Engineering
[3] National Taiwan University,Hydrotech Research Institute
[4] National Chung Hsing University,Department of Civil Engineering
来源
关键词
Reservoir sedimentation; Scale model; Sediment bypass tunnel; Sediment release ability; Economic benefit;
D O I
暂无
中图分类号
学科分类号
摘要
The storage volume of reservoirs is highly susceptible to the effects of sedimentation. This study investigated the Wushe reservoir in Taiwan, the volume of which dropped to just 31.9% of its original capacity in 2016. Our focus is the improvement of desilting operations via scale model experiments involving a sediment bypass tunnel. The experiment parameters included inflow and outflow boundary conditions, sediment discharge, and the shape of particles used in the scale model (i.e., matching those in the real-world location). This study also performed numerical modeling to select upstream inflow boundary conditions for the experiment. The results revealed that the proposed desilting strategy using a sediment bypass tunnel would not only be more effective than the existing outlet in terms of sediment release, but would also provide economic benefits over dredging. The return on investment should be evident within 8–21 years, depending on the scale of the typhoons that strike. There seems little doubt that a sediment bypass tunnel is the best approach to preserving reservoir storage capacity and relieving concerns of an impending water crisis.
引用
收藏
相关论文
共 50 条
  • [1] Experimental study with hydraulic modeling of a reservoir desilting operation using a sediment bypass tunnel
    Huang, Cheng-Chia
    Ho, Hao-Che
    Lai, Jihn-Sung
    Lee, Fong-Zuo
    ENVIRONMENTAL EARTH SCIENCES, 2023, 82 (12)
  • [2] Investigating Sediment Desilting Efficiency of Desilting Tunnel Under Mobile Bed Condition Using Physical Modeling
    Lee, Fong-Zuo
    Lai, Jihn-Sung
    Tu, Hsiu-Chin
    Liao, Che-Min
    Chen, Hsiu-Chuan
    Taiwan Water Conservancy, 2024, 72 (03): : 1 - 16
  • [3] Efficiency evaluation and simulation of sediment bypass tunnel operation: Case study solis reservoir
    Dahal, S.
    Maddahi, M. R.
    Albayrak, I.
    Evers, F. M.
    Vetsch, D. F.
    Stern, L.
    Boes, R. M.
    ROLE OF DAMS AND RESERVOIRS IN A SUCCESSFUL ENERGY TRANSITION, ECS 2023, 2023, : 469 - 478
  • [4] Sediment Conveyance in Solis Reservoir Using a Bypass Tunnel
    Auel, Christian
    Berchtold, Thomas
    Boes, Robert
    WASSERWIRTSCHAFT, 2010, 100 (04) : 119 - 121
  • [5] Discharging Compacted Sediment by Underwater Blasting in Conjunction with a Desilting Tunnel in the Tseng-Wen Reservoir of Taiwan
    Yu, Teng-To
    Peng, W. F.
    Cheng, Y. S.
    Wu, P. Y.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [6] Outflow sediment concentration forecasting by integrating machine learning approaches and time series analysis in reservoir desilting operation
    Chang, Ming-Jui
    Lin, Gwo-Fong
    Lee, Fong-Zuo
    Wang, Yi-Cheng
    Chen, Peng-An
    Wu, Ming-Chang
    Lai, Jihn-Sung
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2020, 34 (06) : 849 - 866
  • [7] Outflow sediment concentration forecasting by integrating machine learning approaches and time series analysis in reservoir desilting operation
    Ming-Jui Chang
    Gwo-Fong Lin
    Fong-Zuo Lee
    Yi-Cheng Wang
    Peng-An Chen
    Ming-Chang Wu
    Jihn-Sung Lai
    Stochastic Environmental Research and Risk Assessment, 2020, 34 : 849 - 866
  • [8] Experimental Study on the Interaction Between the Reservoir and Tunnel During the Construction and Operation Period
    Fu, Helin
    An, Pengtao
    Wu, Yimin
    Li, Jie
    Chen, Long
    Yin, Lijun
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (10) : 13593 - 13601
  • [9] Experimental Study on the Interaction Between the Reservoir and Tunnel During the Construction and Operation Period
    Helin Fu
    Pengtao An
    Yimin Wu
    Jie Li
    Long Chen
    Lijun Yin
    Arabian Journal for Science and Engineering, 2022, 47 : 13593 - 13601
  • [10] Study on sediment desilting operation mode and structure layout of Pakistan Karot hydropower project
    Zhao, J.
    Liu, X. N.
    Fan, B.
    Wei, G.
    Wang, M.
    Jin, Z.
    RIVER SEDIMENTATION, 2017, : 213 - 213