共 50 条
- [1] CAF backfill of primary stopes at Callie underground mine [J]. 9th AusIMM Underground Operators Conference 2005, 2005, 2005 (01): : 151 - 171
- [2] Using paste backfill for stabilizing underground stopes at the Giant Mine remediation project [J]. MINEFILL 2020-2021, 2021, : 44 - 52
- [4] PRODUCTION PLANNING OF UNDERGROUND MINE STOPES WITH CADD [J]. CIM BULLETIN, 1988, 81 (911): : 83 - 84
- [6] Stopes stability in underground mine and its control technique [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2015, 32 (04): : 658 - 664
- [10] Flow Rate Computations in Hydraulic Fill Mine Stopes [J]. Ind. Geotech. J., 2013, 3 (195-202): : 195 - 202