Process control system of the Mutnovskaya geothermal power plant

被引:1
|
作者
Idzon O.M. [1 ]
Ivanov V.V. [1 ]
Ilyushin V.V. [1 ]
Nikol'skii A.I. [1 ]
机构
[1] Interavtomatika Company, VO Tekhnopromeksport Federal, State Unitary Enterprise, Moscow
关键词
Algorithm; Automatic control system; Geothermal power plant; Locking; Power unit; Production process; Regulation; Software and hardware set; Turbine; Videogram;
D O I
10.1023/B:HYCO.0000029633.66429.f1
中图分类号
学科分类号
摘要
The experience of creating software and algorithms for automatic process control at the Mutnovskaya geothermal power plant (GTPP) on the basis of the Teleperm ME automation system is presented. The heat cycle and special features of the heat flow diagram of the power plant are briefly described. The engineering solutions used, the structure of the system, and the principles of process control at the Mutnovskaya GTPP are considered. Special attention is devoted to the turbine regulator that consists of several regulating units because of the great number of problems solved by control valves each regulating unit solves control problems depending on the mode of operation of the power generating set. © 2004 Plenum Publishing Corporation.
引用
收藏
页码:41 / 48
页数:7
相关论文
共 50 条
  • [1] Means of improving the operating efficiency of air condensers at the Verkhne-Mutnovskaya Geothermal Power Plant in Kamchatka
    Parshin B.E.
    Muratov P.V.
    Pashkevich R.I.
    [J]. Power Technology and Engineering, 2007, 41 (4) : 233 - 236
  • [2] Reinjection control in a geothermal power plant
    Casella, F
    Maffezzoni, C
    [J]. PROCEEDINGS OF THE 1998 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, VOLS 1 AND 2, 1996, : 314 - 318
  • [3] DEVELOPMENT OF PLANT PERFORMANCE ANALYSIS SYSTEM FOR GEOTHERMAL POWER PLANT
    Nakao, Yoshinobu
    Takahashi, Toru
    Watanabe, Yutaka
    [J]. PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 551 - 555
  • [4] CONDITIONS OF HYDROTHERMAL ALTERATION OF ROCKS OF THE MUTNOVSKAYA GEOTHERMAL SYSTEM DEDUCED FROM ISOTOPIC DATA
    TARAN, YA
    POKROVSKY, BG
    GLAVATSKIKH, SF
    [J]. GEOKHIMIYA, 1987, (11): : 1569 - 1579
  • [5] Modeling, simulation, control, and optimization of a geothermal power plant
    Casella, F
    [J]. IEEE TRANSACTIONS ON ENERGY CONVERSION, 2004, 19 (01) : 170 - 178
  • [6] Statistical process control for coal fired power plant system
    Aykul, H.
    Ediz, I. G.
    Akcakoca, H.
    Erarslan, K.
    Taksuk, M.
    Dixon-Hardy, D. W.
    [J]. JOURNAL OF THE ENERGY INSTITUTE, 2010, 83 (01) : 41 - 47
  • [7] Analysis of Geothermal Power Plant Process Design for Lahendong Area
    Hakim, Alhafiz Taufiqul
    Jasmine, Aisyah Putri Prameswari
    Juwari
    Renanto
    [J]. JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [8] Cooling tower fill fouling control in a geothermal power plant
    Yu, FP
    Ginn, LD
    McCoy, WF
    [J]. CORROSION REVIEWS, 1999, 17 (3-4): : 205 - 217
  • [9] Modeling and simulation of the production process of electrical energy in a geothermal power plant
    Sanchez, Eduardo
    Torres, Carlos F.
    Guillen, Pablo
    Larrazabal, German
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2013, 57 (9-10) : 2140 - 2148
  • [10] Combined cycle power unit with a binary system based on waste geothermal brine at Mutnovsk geothermal power plant
    Tomarov G.V.
    Shipkov A.A.
    Nikol’skii A.I.
    Semenov V.N.
    [J]. Thermal Engineering, 2016, 63 (6) : 409 - 413