Subgrade settlements of existing railway lines and operational parameters of shield machine induced by twin shield tunnel excavations: A case study双线盾构隧道开挖引起既有铁路路基沉降及盾构掘进参数研究:工程案例

被引:0
|
作者
Xiang Liu
Rui Zhang
Qian Fang
Qian-qian Li
An-nan Jiang
Kui-chen Li
机构
[1] Dalian Maritime University,College of Transportation Engineering
[2] Beijing Jiaotong University,Key Laboratory of Urban Underground Engineering of Ministry of Education
[3] Beijing Urban Rapid Transit Construction Administration Corp.,undefined
来源
关键词
subgrade settlement; operational parameters of shield machine; existing railway lines; shield tunnel; 路基沉降; 盾构掘进参数; 既有铁路; 盾构隧道;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents a case study on the subgrade settlements of four national railway lines induced by twin shield tunnel excavations. The development characteristics of subgrade settlements can be divided into three stages. The monitoring data indicate that subgrade settlements increase gradually before the shield machine crossing the monitoring region, then increase sharply during the shield machine crossing, and finally approach to be stable after the shield machine crossing. Immediately splicing the segments into rings, implementing the compensation and secondary grouting facilitate the control of subgrade settlements. Operational parameters play a crucial role in controlling the subgrade settlements. The effects of the operational parameters of the shield machine on the subgrade settlements are analyzed. The investigation reveals that excessive shield driving velocity causes large subgrade settlements, accompanied by the sudden reduction of rotation torque and total thrust. The excavated earth volume affects the subgrade settlements insensitively because of its easily controlling. Synchronous grouting volume can rise the existing subgrade if not controlled appropriately. Great subgrade settlements cause large earth pressures to be exerted at the chamber. Some valuable references and guidance are given through this paper for the operational parameter setting of shield machines and deformation control of multiple railway lines due to the shield tunnel excavation beneath.
引用
收藏
页码:272 / 287
页数:15
相关论文
共 2 条
  • [1] Subgrade settlements of existing railway lines and operational parameters of shield machine induced by twin shield tunnel excavations: A case study
    Liu, Xiang
    Zhang, Rui
    Fang, Qian
    Li, Qian-qian
    Jiang, An-nan
    Li, Kui-chen
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (01) : 272 - 287
  • [2] 双线盾构隧道开挖引起既有铁路路基沉降及盾构掘进参数研究:工程案例(英文)
    刘翔
    张瑞
    房倩
    李倩倩
    姜谙男
    黎奎辰
    [J]. Journal of Central South University, 2024, 31 (01) : 272 - 287