Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component

被引:0
|
作者
Eungab Kim
Kaphoon Lee
Suk-Ho Kang
机构
[1] Ewha Womans University,College of Business Administration
[2] Seoul National University,Department of Industrial Engineering
关键词
Purchasing policy; Assembly; Supply contract; Markov decision processes; Sensitivity analysis;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers an assembly system where a firm produces a single product which is assembled using two types of components (component 1 and component 2). The components are provided by individual suppliers (supplier 1 and supplier 2). We assume that the firm makes different procurement contracts with supplier 1 and supplier 2. To supplier 1, the firm specifies the maximum inventory level of component 1 and makes a commitment to purchase the component as long as its inventory level is below this target level. To supplier 2, the firm has the option of purchasing or rejecting component 2 at each instant supplier 2 provides it. Formulating our model as a Markov decision problem, we identify a component 2 purchasing policy which maximizes the firm’s profits subject to the costs of rejecting component 1, holding component 2, and purchasing component 2. We also investigate how the changes in the sales price and cost parameters affect the optimal purchasing policy. Finally, we present numerical study for the optimal performance evaluation.
引用
收藏
页码:301 / 327
页数:26
相关论文
共 50 条
  • [1] Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component
    Kim, Eungab
    Lee, Kaphoon
    Kang, Suk-Ho
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 63 (02) : 301 - 327
  • [2] A nearly optimal inspection policy for a two-component series system
    Maaroufi, Ghofrane
    Chelbi, Anis
    Rezg, Nidhal
    Daoud, Ait-Kadi
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2015, 21 (02) : 171 - +
  • [3] A nearly optimal inspection policy for a two-component series system
    Maaroufi, Ghofrane
    Chelbi, Anis
    Rezg, Nidhal
    Ait-Kadi, Daoud
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 956 - 967
  • [4] Optimal replacement policy for a two-component cold standby system with repair priority
    Leung, K. N. F.
    Zhang, Y. L.
    Lai, K. K.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2010, 224 (B6) : 963 - 970
  • [5] Decentralized inventory control in a two-component assembly system
    Chu, Hongsheng
    Wang, Jingchun
    Jin, Yihui
    Suo, Hansheng
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 102 (02) : 255 - 264
  • [6] An optimal replacement policy for a two-component series system assuming geometric process repair
    Wang, Guan Jun
    Zhang, Yuan Lin
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2007, 54 (02) : 192 - 202
  • [7] A small protein that mediates the activation of a two-component system by another two-component system
    Kox, LFF
    Wösten, MMSM
    Groisman, EA
    EMBO JOURNAL, 2000, 19 (08): : 1861 - 1872
  • [8] On the optimal allocation of two active redundancies in a two-component series system
    Valdés, JE
    Zequeira, RI
    OPERATIONS RESEARCH LETTERS, 2006, 34 (01) : 49 - 52
  • [9] On the optimal allocation of an active redundancy in a two-component series system
    Valdés, JE
    Zequeira, RI
    STATISTICS & PROBABILITY LETTERS, 2003, 63 (03) : 325 - 332
  • [10] On the inspection policy of a two-component parallel system with failure interaction
    Zequeira, RI
    Bérenguer, C
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2005, 88 (01) : 99 - 107