Dynamic responses of bridge-approach embankment transition section of high-speed rail

被引:0
|
作者
Chang-wei Yang
Hai-ling Sun
Jian-jing Zhang
Chuan-bin Zhu
Li-ping Yan
机构
[1] Southwest Jiaotong University,Civil Engineering School
[2] Henan University of Urban Construction,Department of Engineering Management
[3] Los Angeles Department of Water and Power,Geotechnical Engineering Group
来源
关键词
high-speed rail; bridge-approach embankment section; numerical model; track deflection angle;
D O I
暂无
中图分类号
学科分类号
摘要
Based on the vehicle-track coupling dynamics theory, a new spatial dynamic numerical model of vehicle-track-subgrade coupling system was established considering the interaction among different structural layers in the subgrade system. The dynamic responses of the coupled system were analyzed when the speed of train was 350 km/h and the transition was filled with graded broken stones mixed with 5% cement. The results indicate that the setting form of bridge-approach embankment section has little effect on the dynamic responses, thus designers can choose it on account of the practical circumstances. Because the location about 5 m from the bridge abutment has the greatest deformation, the stiffness within 0–5 m zone behind the abutment should be specially designed. The results of the study from vehicle-track dynamics show that the maximum allowable track deflection angle should be 0.09% and the coefficient of subgrade reaction (K30) is greater than 190 MPa within the 0–5 m zone behind the abutment and greater than 150 MPa in other zones.
引用
收藏
页码:2830 / 2839
页数:9
相关论文
共 50 条
  • [1] Dynamic responses of bridge-approach embankment transition section of high-speed rail
    杨长卫
    孙海玲
    张建经
    朱传彬
    颜利平
    [J]. Journal of Central South University, 2013, 20 (10) : 2830 - 2839
  • [2] Dynamic responses of bridge-approach embankment transition section of high-speed rail
    Yang Chang-wei
    Sun Hai-ling
    Zhang Jian-jing
    Zhu Chuan-bin
    Yan Li-ping
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2013, 20 (10) : 2830 - 2839
  • [3] Dynamic Analysis of Bridge-approach Embankment Transition Segment
    Li, Zhenxia
    Chen, Yuanzhao
    [J]. INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 719 - 722
  • [4] Analysis of Dynamic Responses of Bridge-Subgrade Transition of High-Speed Railway
    Yang, Changwei
    Zhang, Jianjing
    Zhu, Chuanbin
    [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 189 - 196
  • [5] Field investigation of dynamic responses of a culvert-embankment transition zone in high-speed railway
    Qu, Changzi
    Wang, Zheng
    Wei, Limin
    Xiao, Yuanjie
    Chang, Zhenxing
    [J]. SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2022, 158
  • [6] Dynamic responses of high-speed railway continuous bridge
    Wang, Qingbo
    Wang, Sheng
    Xu, Kebin
    Xia, He
    [J]. Beifang Jiaotong Daxue Xuebao/Journal of Northern Jiaotong University, 1997, 21 (04): : 399 - 404
  • [7] Dynamic responses of bridge substructures subjected to high-speed trains
    Pugasap, Kongsak
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2020, 173 (03) : 143 - 157
  • [8] Railroad embankment stabilization demonstration for high-speed rail corridors
    Sluz, A
    Sussmann, TR
    Samavedam, G
    [J]. GROUTING AND GROUND TREATMENT, VOL 2, PROCEEDINGS, 2003, (120): : 803 - 812
  • [9] Dynamic Analysis of Geosynthetic-reinforced Pile-supported Embankment for a High-Speed Rail
    Alsirawan, Rashad
    Koch, Edina
    [J]. ACTA POLYTECHNICA HUNGARICA, 2024, 21 (01) : 31 - 50
  • [10] Dynamic Performance of Pile-Supported Bridge-Embankment Transition Zones Under High-Speed Train Moving Loads
    Li, Wei
    Bian, Xuecheng
    [J]. ADVANCES IN TRANSPORTATION GEOTECHNICS III, 2016, 143 : 1059 - 1067