The Coal Mining Model Under Slippery Slope in Yiminhe Open Pit Coal Mines

被引:0
|
作者
Shaohui Wang
Wei Zhou
Qingxiang Cai
Xuyang Shi
Xiang Lu
Boyu Luan
机构
[1] China University of Mining and Technology,School of Mines
关键词
Surface coal mine; Mining slope; Unloading; Timeliness length; Supporting wall model;
D O I
暂无
中图分类号
学科分类号
摘要
To study the unloading of in situ rock stress in coalmining process, mechanics analysis has been carried out, according to which, a stress unloading arch tends to come into being where the slopes are of short strike length. Due to the differences existing between the reserved supporting body and the backfill supporting body, the combined arch walls are characterized with asymmetric property, coordinate deformation property and hierarchy. And on the basis of the rock rheology and timeliness strength, the instability criteria for weak-layered slopes are provided here. By applying unloading analysis system and the numerical simulation software, we probed into the unloading timeliness length for mining slopes located in Yiminhe surface coal mine as well as the X-axis creep displacement occurring at the slope foot under the influence of unbalanced stress. And based on these facts, we proposed a resource recovery plans specifically drawn up for the slippery areas. The research results indicate the following conclusions: (1) there is a linear relationship between the timeliness length of unbalanced stress unloading and the mining parameters (mining depth and width), so the linear gradient increases with growing mining depth and width; (2) with growing mining parameters, the increase of X-axis creep displacement at slope foot shifts from linear function to quadratic function; (3) by adopting short working line and intense working face advance, it is highly probable to recover a total amount of 3.5 million tons of coals on condition of stable slope.
引用
收藏
页码:3727 / 3737
页数:10
相关论文
共 50 条
  • [1] The Coal Mining Model Under Slippery Slope in Yiminhe Open Pit Coal Mines
    Wang, Shaohui
    Zhou, Wei
    Cai, Qingxiang
    Shi, Xuyang
    Lu, Xiang
    Luan, Boyu
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (05) : 3727 - 3737
  • [2] Slope Failure Behavior Analysis in Open Pit Coal Mining
    Saptono, Singgih
    Musa, Rachmat Hamid
    [J]. ADVANCED SCIENCE LETTERS, 2018, 24 (12) : 9081 - 9088
  • [3] Discussion and exploration of management measures for slope stabilization of open pit coal mines
    Zhang, Peng
    Liu, Bo
    Zhou, Yuanye
    [J]. PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON ENVIRONMENT, MATERIALS, CHEMISTRY AND POWER ELECTRONICS, 2016, 84 : 50 - 52
  • [4] The Thin Coal Seam (TCS) Mining Technology for Open Pit Mines in China
    Liu P.
    Zhou W.
    Cai Q.
    Shi X.
    Xu G.
    [J]. Geotechnical and Geological Engineering, 2018, 36 (6) : 3627 - 3637
  • [5] Quantifying the coal mining impact on the ecological environment of Gobi open-pit mines
    Liu, Ying
    Heng, Wenjing
    Yue, Hui
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 883
  • [6] The assessment and management of coal recovery in open pit mines
    Scott, A
    [J]. MINE TO MILL 1998 CONFERENCE, 1998, 98 (04): : 93 - 99
  • [7] Diversification of open pit coal mining with draglining
    V. I. Cheskidov
    V. K. Norri
    G. G. Sakantsev
    [J]. Journal of Mining Science, 2014, 50 : 690 - 695
  • [8] Diversification of open pit coal mining with draglining
    Cheskidov, V. I.
    Norri, V. K.
    Sakantsev, G. G.
    [J]. JOURNAL OF MINING SCIENCE, 2014, 50 (04) : 690 - 695
  • [9] Analysis of mathematical model of road safety fencing in open pit coal mines
    S. V. Cherdantsev
    N. A. Kucher
    [J]. Journal of Mining Science, 2012, 48 : 832 - 838
  • [10] Numerical simulation of slope stability in the first mining of open-pit coal mine
    Sun, Guangyi
    Luo, Xiao
    [J]. ENVIRONMENTAL PROTECTION AND RESOURCES EXPLOITATION, PTS 1-3, 2013, 807-809 : 2371 - 2377