Scheduling jobs and maintenance activities on parallel machines

被引:0
|
作者
Maher Rebai
Imed Kacem
Kondo H. Adjallah
机构
[1] University of technology of Troyes,ICD CNRS FRE 2848
[2] Université de Lorraine,LCOMS
[3] Ecole Nationale d’Ingénieurs de Metz,LGIPM
来源
Operational Research | 2013年 / 13卷
关键词
Maintenance; Scheduling; Lower bound; Heuristic;
D O I
暂无
中图分类号
学科分类号
摘要
In this article, we deal with the problem of scheduling N production jobs on M parallel machines. Each machine should be maintained once during the planning horizon. We consider the case where the maintenance of the machines should start at time zero and the resources that ensure the maintenance are not sufficient. For such a reason, the maintenance tasks must be continuously run during the planning horizon. We aim to find a schedule composed of the production jobs and the maintenance tasks for which the total sum of the jobs’ weighted completion times and the preventive maintenance cost are minimized. We optimally solve the problem by an integer linear programming method. We also propose a heuristic method computed in two phases. Computational experiments are performed on randomly generated instances and the results show that the proposed methods produce satisfactory solutions for the problem.
引用
收藏
页码:363 / 383
页数:20
相关论文
共 50 条
  • [1] Scheduling jobs and maintenance activities on parallel machines
    Rebai, Maher
    Kacem, Imed
    Adjallah, Kondo H.
    [J]. OPERATIONAL RESEARCH, 2013, 13 (03) : 363 - 383
  • [2] Scheduling jobs and maintenance activities on parallel machines
    Lee, CY
    Chen, ZL
    [J]. NAVAL RESEARCH LOGISTICS, 2000, 47 (02) : 145 - 165
  • [3] Scheduling Jobs and Preventive Maintenance Activities on Parallel Machines
    Rebai, Maher
    Kacem, Imed
    Adjallah, Kondo H.
    [J]. SELECTED TOPICS IN APPLIED COMPUTER SCIENCE, 2010, : 406 - +
  • [4] The scheduling for parallel machines with periodic maintenance and setup activities
    Chung, SH
    Tai, YT
    Tsai, PH
    [J]. MSV '05: Proceedings of the 2005 International Conference on Modeling, Simulation and Visualization Methods, 2005, : 229 - 235
  • [5] Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
    Sun, Kaibiao
    Li, Hongxing
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 124 (01) : 151 - 158
  • [6] Branch and Bound for Scheduling Jobs on Parallel Machines under Maintenance Constraints
    Rebai, Maher
    Kacem, Imed
    Adjallah, Kondo H.
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 784 - 789
  • [7] Scheduling Jobs on Dedicated Parallel Machines
    Shim, Sang-Oh
    Choi, Seong-Woo
    [J]. ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING II, PTS 1-3, 2013, 433-435 : 2363 - +
  • [8] Parallel Machines Scheduling with Deteriorating Maintenance Activities and Job Rejection
    Zou, Juan
    Sui, Yu-Kang
    Gao, Jie
    Zhang, Xian-Zhao
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (01)
  • [9] A scheduling model for serial jobs on parallel machines with different preventive maintenance (PM)
    Mirabedini, S. Nima
    Iranmanesh, Hossein
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (9-12): : 1579 - 1589
  • [10] A scheduling model for serial jobs on parallel machines with different preventive maintenance (PM)
    S. Nima Mirabedini
    Hossein Iranmanesh
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1579 - 1589