Experience gained from operation of the GTE-160 gas turbine installation and prospects for its modernization

被引:1
|
作者
Lebedev A.S. [1 ]
Pavlov A.Y. [1 ]
Richter F. [2 ]
Adamchuk A.A. [3 ]
机构
[1] Siemens Gas Turbine Technologies, St. Petersburg 195027, Sverdlovskaya nab. 44, lit. D, BTs Leto
[2] Siemens AG, Berlin 10553
[3] Silovye Mashiny, St. Petersburg 195009, ul. Vatutina 3, lit. A
关键词
combined-cycle power plant; construction; field experience; gas turbine unit; integrated testing; modernization; negative temperatures of outdoor air; reference;
D O I
10.1134/S0040601513020043
中图分类号
学科分类号
摘要
Experience gained from operation of the GTE-160 gas turbine installation produced by Silovye Mashiny according to the licensing documentation of Siemens since 2001. As of June 2012, 32 GTE-160 gas turbine units had been supplied and were in successful operation at power stations in different regions of the Russian Federation and abroad as part of PGU-450 and PGU-230 combined-cycle power plants. Technical solutions are presented the use of which excludes embrittlement of materials at outdoor air temperatures below -40 C and ensures reliable operation of the gas turbine unit without using expensive air heating systems in an integrated air cleaning device at low temperatures. © 2013 Pleiades Publishing, Ltd.