Basic performance indicators of the PGU-450T steam-gas unit during operation in the district heating and electric power mode

被引:0
|
作者
Yu. A. Radin
A. A. Lyubtsov
O. N. Makarov
机构
[1] Radin, Yu.A.
[2] Lyubtsov, A.A.
[3] Makarov, O.N.
来源
Radin, Yu.A | 1600年 / Springer Science and Business Media, LLC卷 / 46期
关键词
steam-gas unit; district heating and electric power mode; gas turbine; steam turbine; boiler-utilizer; engineering and economic indicators;
D O I
10.1007/s10749-012-0309-x
中图分类号
学科分类号
摘要
The basic performance indicators of the PGU-450T steam-gas unit during operation in the district heating and electric power generation mode are reported, based on tests at units of the North-west Heating and Electric Power Plant (TÉTs) and the TÉTs-27 Heating and Electric Power Plant of the firm JSC “Mosénergo.”
引用
收藏
页码:70 / 74
页数:4
相关论文
共 7 条
  • [1] PGU-230 steam-gas unit design for combined cycle operation at the Heller thermal power plant
    Davydov A.V.
    Radin Yu.A.
    Il'In M.N.
    Orlov M.V.
    Andrianov Yu.F.
    Mishustin N.I.
    Lebedev A.S.
    Lisyanskii A.S.
    Obukhov S.G.
    Guyash F.
    [J]. Power Technology and Engineering, 2010, 44 (03) : 220 - 226
  • [2] Analysis of the Phase Transition Zone Location in the Flow Section of the PGU-450T Steam Turbine During Various Modes of Operation
    Lebedeva A.I.
    Berezinets P.A.
    Tkhabisimov A.B.
    [J]. Power Technology and Engineering, 2018, 52 (4) : 438 - 443
  • [3] Computational and experimental test of self starting regimes for the in-house needs of the PGU-450 steam-gas unit at the Kaliningrad TÉTs-2 Heating and Power Plant during supply disruptions
    Sakharov S.N.
    Kuz'michev V.A.
    [J]. Power Technology and Engineering, 2008, 42 (03) : 167 - 176
  • [4] Commissioning of the PGU-220 Steam-Gas Power Generating Unit at the TÉTS-12 Thermal Power Plant of PJSC “Mosenergo”
    Radin Y.A.
    Rumyantsev S.V.
    Smyshlyaev V.B.
    Gorlatov D.I.
    Grishin I.A.
    [J]. Power Technology and Engineering, 2016, 50 (04) : 401 - 406
  • [5] Analysis of the allowable rates of an increase in pressure in heat recovery boiler drums during startups and shutdowns of a PGU-450T power unit
    Radin, Yu.A.
    Kontorovich, T.S.
    Davydov, A.V.
    Kostyuk, R.I.
    Chugin, A.V.
    Petrov, Yu.V.
    Dovgii, O.A.
    [J]. Thermal Engineering, 2004, 51 (09) : 699 - 706
  • [6] Experience in the development and introduction of a full scale process control system for the PGU-450T power production unit at Mosénergo TÉTs-27 heat and electric power plant
    Kopsov A.Ya.
    Sviderskii A.G.
    Bilenko V.A.
    Dobrev E.N.
    Ukolov S.V.
    Zhezherya D.A.
    Plotnikov D.V.
    Shavochkin I.A.
    Manevskaya O.A.
    Asoskov O.G.
    [J]. Power Technology and Engineering, 2009, 43 (2) : 114 - 122
  • [7] Investigation of a P-96 heat-recovery boiler used as part of the PGU-450T power unit at the Kaliningrad TETs-2 cogeneration station in the course of perfecting the starting and shutdown operations and during running with base loads
    Lepaev P.A.
    Shtan' T.P.
    Glusker B.N.
    Pashnin L.V.
    Konovalov P.S.
    [J]. Thermal Engineering, 2007, 54 (9) : 677 - 684