共 50 条
Experience in operating the Sayano-Shushenskoe and Maina hydroelectric stations in the winter
被引:0
|作者:
Sulimova L.I.
机构:
关键词:
Reservoir Level;
Maina Reservoir;
Lower Pool;
Maximum Water Level;
Downstream Stretch;
D O I:
10.1007/BF02767311
中图分类号:
学科分类号:
摘要:
[No abstract available]
引用
收藏
页码:417 / 419
页数:2
相关论文