共 50 条
- [2] Discussion on Application of the multifunctional jack-up platform ADVANCED MECHANICAL DESIGN, PTS 1-3, 2012, 479-481 : 1059 - 1065
- [3] Study on the Legs Connection Technology of Jack-up Drilling Platform MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 3414 - 3418
- [4] Spudcan bearing capacity calculation of the offshore jack-up drilling platform during the preloading process Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2011, 38 (05): : 613 - 619
- [5] Synchronous control of jacking system of jack-up offshore drilling platform 2018, University of Petroleum, China (42): : 149 - 156
- [7] Collision Analysis Between Spudcan and Seabed During the Process of Jack-up Platform Lowering Jack-up Legs China Ocean Engineering, 2021, 35 : 779 - 788
- [9] A PROBABILISTIC APPROACH TO DESIGN ICE LOADS FOR AN ARCTIC JACK-UP DRILLING PLATFORM OMAE 2008: PROCEEDINGS OF THE 27TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCTIC ENGINEERING - 2008, VOL 2: STRUCTURES, SAFETY AND RELIABILITY, 2008, : 477 - 485
- [10] RESEARCH ON MECHANISM OF JACK-UP DRILLING PLATFORM SPUDCAN PENETRATING INTO SATURATED SAND Gongcheng Lixue/Engineering Mechanics, 2023, 40 (06): : 144 - 157