Application of Analytic Hierarchy process (AHP) in the Layout of Jack-Up Drilling Platform

被引:0
|
作者
Zhang Yi
Wang Wei
Mu Langfeng
Wang Siqi
Zhang Fengyan
Li Lixin
机构
[1] Chinese Academy of Geological Sciences and China Geological Survey,Chinese Academy of Geological Sciences, SinoProbe Center
关键词
jack-up drilling platform; analytic hierarchy process; platform layout scheme;
D O I
暂无
中图分类号
学科分类号
摘要
The scientific and reasonable layout of jack-up drilling platform can improve the efficiency and safety of drilling platform operation. Through the application of analytic hierarchy process (AHP) and the establishment of comprehensive evaluation and analysis model, this paper analyzes the commonly used drilling platform layout scheme and optimizes the scheme to meet operational requirements and to improve the ability of the drilling platform operation.
引用
收藏
页码:236 / 242
页数:6
相关论文
共 50 条
  • [1] Application of Analytic Hierarchy process (AHP) in the Layout of Jack-Up Drilling Platform
    Zhang Yi
    Wang Wei
    Mu Langfeng
    Wang Siqi
    Zhang Fengyan
    Li Lixin
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2020, 56 (02) : 236 - 242
  • [2] Discussion on Application of the multifunctional jack-up platform
    Yang, Yanhua
    Jin, Shucheng
    Zhang, Yongtao
    ADVANCED MECHANICAL DESIGN, PTS 1-3, 2012, 479-481 : 1059 - 1065
  • [3] Study on the Legs Connection Technology of Jack-up Drilling Platform
    Qin, Hongde
    Zhu, Yazhou
    MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 3414 - 3418
  • [4] Spudcan bearing capacity calculation of the offshore jack-up drilling platform during the preloading process
    Zhang, Puyang
    Yu, Xiaoyang
    Ding, Hongyan
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2011, 38 (05): : 613 - 619
  • [5] Synchronous control of jacking system of jack-up offshore drilling platform
    He X.
    Shi L.
    2018, University of Petroleum, China (42): : 149 - 156
  • [6] Collision Analysis Between Spudcan and Seabed During the Process of Jack-up Platform Lowering Jack-up Legs
    LE Cong-huan
    LI Yan-e
    HUANG Lei
    REN Jian-yu
    DING Hong-yan
    ZHANG Pu-yang
    ChinaOceanEngineering, 2021, 35 (05) : 779 - 788
  • [7] Collision Analysis Between Spudcan and Seabed During the Process of Jack-up Platform Lowering Jack-up Legs
    Cong-huan Le
    Yan-e Li
    Lei Huang
    Jian-yu Ren
    Hong-yan Ding
    Pu-yang Zhang
    China Ocean Engineering, 2021, 35 : 779 - 788
  • [8] Collision Analysis Between Spudcan and Seabed During the Process of Jack-up Platform Lowering Jack-up Legs
    Le Cong-huan
    Li Yan-e
    Huang Lei
    Ren Jian-yu
    Ding Hong-yan
    Zhang Pu-yang
    CHINA OCEAN ENGINEERING, 2021, 35 (05) : 779 - 788
  • [9] A PROBABILISTIC APPROACH TO DESIGN ICE LOADS FOR AN ARCTIC JACK-UP DRILLING PLATFORM
    Cammaert, A. B.
    Trurnars, Jenny
    Eide, Lars Ingolf
    OMAE 2008: PROCEEDINGS OF THE 27TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCTIC ENGINEERING - 2008, VOL 2: STRUCTURES, SAFETY AND RELIABILITY, 2008, : 477 - 485
  • [10] RESEARCH ON MECHANISM OF JACK-UP DRILLING PLATFORM SPUDCAN PENETRATING INTO SATURATED SAND
    Zhou Z.-J.
    Qi C.-G.
    Kong G.-Q.
    Zhong F.-T.
    Zhang Z.-C.
    Lai W.-J.
    Gongcheng Lixue/Engineering Mechanics, 2023, 40 (06): : 144 - 157