共 50 条
- [3] The Establishment of EPC General Contractor Risk Evaluation Model Based on Extension Matter-Element Theory PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3429 - 3436
- [5] Grey system theory-based overseas investment risk assessment for mining enterprises PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 769 - 773
- [6] Research on risk evaluation model of distribution network project based on extension matter element 2018 FIRST INTERNATIONAL CONFERENCE ON ENVIRONMENT PREVENTION AND POLLUTION CONTROL TECHNOLOGY (EPPCT 2018), 2018, 199
- [7] Risk evaluation method based on set pair analysis applied to overseas mining investment GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2018, 34 (04): : 145 - 164
- [8] Predication model of game theory-matter-element extension for blastability classification and its application Hu, J.-H. (hujh21@csu.edu.cn), 2013, China University of Mining and Technology (30):
- [9] Risk assessment of transmission towers based on variable weight theory and matter-element extension model ENGINEERING RESEARCH EXPRESS, 2024, 6 (04):
- [10] FUZZY EXTENSION MODEL OF CULVERTS SAFETY EVALUATION BASED ON GAME THEORY PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4215 - 4224