共 50 条
- [1] Controlling mechanism of gob-side entry retaining without backfilling wall and its application Electronic Journal of Geotechnical Engineering, 2014, 19 (0Q): : 4321 - 4332
- [3] Deformation behavior of gob-side filling body of gob-side retaining entry in the deep backfilling workface Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (01): : 62 - 72
- [6] Comparison and cause analysis of roadway failure characteristics between gob-side entry retaining with roadway advance excavation and general gob-side entry retained method Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2023, 40 (06): : 1129 - 1138
- [8] Study on Gob-Side Entry Retaining of Field Application PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENT ENGINEERING (ICSEEE 2016), 2016, 63 : 174 - 176
- [9] Analysis on the supporting technology of the gob-side entry retaining PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 287 - 290
- [10] Technology of gob-side entry retaining on its original position in fully-mechanized coalface with solid material backfilling Meitan Xuebao/Journal of the China Coal Society, 2011, 36 (10): : 1624 - 1628