Piled raft foundations, wherein a small number of connected piles are utilized as settlement reducers, have been widely used for high-rise buildings. Recently, a new technique has been introduced by disconnecting the piles from the raft and inserting a cushion layer between them. In such cases, the piles are considered as soil reinforcement components rather than structural members. To explore the feasibility of utilizing the disconnected piled raft foundation, a series of experimental model tests were conducted to examine the load–settlement behavior and pile load sharing ratio of the connected piled raft (CPR) and disconnected piled raft (DCPR) foundation systems using cushions of different thicknesses and stiffnesses. In addition, ABAQUS 3D finite element analyses were performed to analyze the axial stress along the piles and the bending moments along the raft. The results indicated that the total settlement of the system was minimized significantly when disconnected piles were used. In addition, the disconnected technique provided a significant reduction in the axial stress along the piles and the bending moment along the raft compared with that of the CPR. These findings may be accompanied by economic and environmental benefits.
引用
收藏
页码:2442 / 2454
页数:12
相关论文
共 50 条
  • [1] Experimental and Numerical Modeling of Connected and Disconnected Piled Raft
    Alhassani, Athraa Mohammed Jawad
    Aljorany, Ala Nasir
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (06) : 2442 - 2454
  • [2] A Numerical Study on the Behavior of Disconnected Composite Piled Raft, Composite Piled Raft, and Unpiled Raft under Axial Load
    Seethalakshmi, P.
    Dey, Rohan
    Juneja, Ashish
    IFCEE 2021: INSTALLATION, TESTING, AND ANALYSIS OF DEEP FOUNDATIONS, 2021, 323 : 508 - 518
  • [3] Load transfer mechanism for connected and disconnected piled raft: a comparative study
    Prasun Halder
    Bappaditya Manna
    Acta Geotechnica, 2022, 17 : 3033 - 3045
  • [4] Load transfer mechanism for connected and disconnected piled raft: a comparative study
    Halder, Prasun
    Manna, Bappaditya
    ACTA GEOTECHNICA, 2022, 17 (07) : 3033 - 3045
  • [5] Experimental assessment of the performance of cushioned disconnected piled raft system
    Prasun Halder
    Kavita Tandon
    Rohit Ralli
    Bappaditya Manna
    Arabian Journal of Geosciences, 2024, 17 (3)
  • [6] Study of piled and disconnected piled raft system with raft foundation in cohesionless soil
    Kaavya, D.
    Krishnan, Divya K.
    Ravichandran, P. T.
    3RD INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING (ICAME 2020), PTS 1-6, 2020, 912
  • [7] Centrifuge modeling of disconnected piled raft using vertical pushover tests
    Park, Heon-Joon
    Ko, Kil-Wan
    Song, Young-Hun
    Song, Myung-Jun
    Jin, Seokwoo
    Ha, Jeong-Gon
    Kim, Dong-Soo
    ACTA GEOTECHNICA, 2020, 15 (09) : 2637 - 2648
  • [8] Centrifuge modeling of disconnected piled raft using vertical pushover tests
    Heon-Joon Park
    Kil-Wan Ko
    Young-Hun Song
    Myung-Jun Song
    Seokwoo Jin
    Jeong-Gon Ha
    Dong-Soo Kim
    Acta Geotechnica, 2020, 15 : 2637 - 2648
  • [9] Numerical modeling of connected piled raft foundation under seismic loading in layered soils
    Ali, Ahmed M.
    Karkush, Mahdi O.
    Al-Jorany, Ala N.
    JOURNAL OF THE MECHANICAL BEHAVIOR OF MATERIALS, 2023, 32 (01)
  • [10] Centrifuge modeling of non-connected piled raft system
    Rasouli, H.
    Azizkandi, A. Saeedi
    Baziar, M. H.
    Modarresi, M.
    Shahnazari, H.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2015, 13 (2B) : 114 - 123