Risk assessment for unexploded ordnance remediation

被引:0
|
作者
Laurens Beran
Barry Zelt
机构
[1] Black Tusk Geophysics,
关键词
Unexploded ordnance; Risk assessment; Receiver operating characteristic; Compliance sampling;
D O I
暂无
中图分类号
学科分类号
摘要
We develop and compare methods for assessing the risk that unexploded ordnance (UXO) have been missed following prioritized digging. A random compliance sampling approach has been suggested for UXO risk assessment, and we extend this approach to account for the bias in prioritized digging, thereby reducing the number of excavations required to test for outlying UXO. We then discuss and compare methods for identification of outliers to the distribution of UXO via generative models of the receiver operating characteristic (ROC). Next, we consider how seeded items emplaced for quality control can be used to increase confidence in the classification process, and we model this process by constraining the ROC model. Finally, we turn to the problem of identifying novel, or unique, UXO with prioritized validation digs. We propose a metric that combines features of the geophysical model estimated for each detected target to identify novel UXO. The metric requires no prior information about the UXO present at a site.
引用
收藏
页码:1051 / 1061
页数:10
相关论文
共 50 条
  • [1] Risk assessment for unexploded ordnance remediation
    Beran, Laurens
    Zelt, Barry
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2015, 29 (03) : 1051 - 1061
  • [2] Selecting a discrimination algorithm for unexploded ordnance remediation
    Beran, Laurens
    Oldenburg, Douglas W.
    IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING, 2008, 46 (09): : 2547 - 2557
  • [3] SETTING THE STOP DIG POINT FOR UNEXPLODED ORDNANCE REMEDIATION
    Beran, Laurens
    Zelt, Barry
    2014 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2014, : 2193 - 2196
  • [4] Sediment trend analysis in support of unexploded explosive ordnance risk assessment
    McLaren, Patrick
    Braid, Matthew
    Journal of ASTM International, 2009, 6 (07):
  • [5] Unexploded ordnance
    Ozanian, MK
    FORBES, 2004, 174 (06): : 130 - 131
  • [6] Removal of unexploded ordnance
    Oh, John S.
    JOURNAL OF TRAUMA-INJURY INFECTION AND CRITICAL CARE, 2007, 62 (06): : S21 - S21
  • [7] Unexploded Ordnance Management
    Oh, John S.
    Seery, Jason M.
    Grabo, Daniel J.
    Ervin, Mark D.
    Wertin, Tom M.
    Hawks, Ryan P.
    Benov, Avi
    Stockinger, Zsolt T.
    MILITARY MEDICINE, 2018, 183 : 24 - 28
  • [8] The risk of unexploded ordnance on construction sites in London, UK
    Owen, Marc
    McNamara, Andrew
    Panchal, Jignasha
    ENVIRONMENTAL GEOTECHNICS, 2021, 8 (02): : 116 - 123
  • [9] Reducing Risk on Unexploded Ordnance by Vibrations in the Rotterdam Subsoil
    Zandbergen, Don
    Martens, Joost
    GEOTECHNICAL SAFETY AND RISK V, 2015, : 191 - 196
  • [10] Cleaning up unexploded ordnance
    MacDonald, JA
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2001, 35 (17) : 372A - 376A