共 50 条
- [1] A Novel Ant Colony Algorithm for the Single-Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times [J]. INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2011, 4 (04): : 456 - 466
- [4] IFF algorithm for the single machine total weighted tardiness scheduling problem with sequence dependent setup times [J]. Luo, J.-X., 2012, Systems Engineering Society of China (32):
- [6] A Discrete Differential Evolution Algorithm for Single Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times [J]. 2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 2613 - +
- [7] Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem [J]. Journal of Scheduling, 2016, 19 : 191 - 205
- [10] An improved ant colony algorithm for a single-machine scheduling problem with setup times [J]. 1ST INTERNATIONAL SYMPOSIUM ON DIGITAL MANUFACTURE, VOLS 1-3, 2006, : 956 - 961