Advanced treatment of recalcitrant textile wastewater and goal-oriented process design

被引:0
|
作者
Dukgyu Han
Moonil Kim
Wookeun Bae
机构
[1] Korea Industrial Complex Corporation (KICOX),Dept. of Civil and Environmental Engineering
[2] Hanyang University,undefined
来源
关键词
activated sludge; cell-immobilized pellet; coagulation/precipitation; ozone; textile wastewater;
D O I
暂无
中图分类号
学科分类号
摘要
This study was intended to evaluate the performance of a biological and a chemical treatment process of recalcitrant textile wastewater. The biological process consisted of Activated Sludge (AS) reactor followed by column reactor packed with cellimmobilized pellets. The chemical process consisted of coagulation/precipitation and ozone oxidation. Experiments were conducted by pilot-scale reactors fed with textile wastewater. The removal efficiency of BOD by AS process was 85%, but only 45% of the COD was removed, indicating the AS process was not satisfactory in removing recalcitrant organic matter. However, the packed-bed column reactor effectively removed the recalcitrant organic matter, showing stable performance at an empty bed contact time of 8. hours. Both PAC and ferric chloride appeared to be excellent coagulants for removal of the remained hardly-biodegradable COD. Although the previous biological processes and coagulation/precipitation had already removed 74% of the color in the influent, most of the remaining color was removed by ozone oxidation at a contact time of 20 minute. A combination of AS, PEG-pellet column, and coagulation/precipitation produced a good effluent quality which met the discharge standards of most Asian countries. Additionally, if the ozone oxidation was added, the effluent quality could meet more stringent standards of advanced countries.
引用
收藏
页码:86 / 92
页数:6
相关论文
共 50 条
  • [1] Advanced treatment of recalcitrant textile wastewater and goal-oriented process design
    Han, Dukgyu
    Kim, Moonil
    Bae, Wookeun
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (01) : 86 - 92
  • [2] Goal-oriented requirements analysis for process control systems design
    El-Maddah, I
    Maibaum, T
    [J]. FIRST ACM AND IEEE INTERNATIONAL CONFERENCE ON FORMAL METHODS AND MODELS FOR CO-DESIGN, PROCEEDINGS, 2003, : 45 - 46
  • [3] Goal-oriented Process Enhancement and Discovery
    Ghasemi, Mahdi
    Amyot, Daniel
    [J]. BUSINESS PROCESS MANAGEMENT (BPM 2019), 2019, 11675 : 102 - 118
  • [4] On Goal-Oriented Business Process Simulation
    Vasilecas, Olegas
    Vysockis, Tadas
    Rusinaite, Toma
    [J]. 2016 IEEE 4TH WORKSHOP ON ADVANCES IN INFORMATION, ELECTRONIC AND ELECTRICAL ENGINEERING (AIEEE), 2016,
  • [5] Towards Goal-oriented Process Mining
    Ghasemi, Mahdi
    [J]. 2018 IEEE 26TH INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE (RE 2018), 2018, : 484 - 489
  • [6] Goal-oriented conceptual database design
    Jiang, Lei
    Topaloglou, Thodoros
    Borgida, Alex
    Mylopoulos, John
    [J]. 15TH IEEE INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE, PROCEEDINGS, 2007, : 195 - +
  • [7] Goal-Oriented Software Design Reviews
    Wakimoto, Michiyo
    Morisaki, Shuji
    [J]. IEEE ACCESS, 2022, 10 (32584-32594): : 32584 - 32594
  • [8] Advanced treatment of textile wastewater by hybrid process
    Kim, TH
    Park, C
    Shin, EB
    Kim, S
    [J]. ENERGY & ENVIRONMENT - A WORLD OF CHALLENGES AND OPPORTUNITIES, PROCEEDINGS, 2003, : 521 - 525
  • [9] GOAL-ORIENTED TREATMENT IN OSTEOPOROSIS: AN INTRODUCTION
    Ferrari, S.
    [J]. OSTEOPOROSIS INTERNATIONAL, 2014, 25 : S143 - S144
  • [10] Data Preprocessing for Goal-oriented Process Discovery
    Ghasemi, Mahdi
    Amyot, Daniel
    [J]. 2019 IEEE 27TH INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE WORKSHOPS (REW 2019), 2019, : 200 - 206