Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry

被引:1
|
作者
Yin-Yann Chen
Tzu-Li Chen
Cheng-Dar Liou
机构
[1] National Formosa University,Department of Industrial Management
[2] Fu Jen Catholic University,Department of Information Management
[3] National Formosa University,Department of Business Administration
关键词
Capacity planning; Multi-site planning; Semiconductor foundry;
D O I
暂无
中图分类号
学科分类号
摘要
The foundry is an industry whose demand varies rapidly and whose manufacturing process is quite complicated. This paper explores issues on mid-term capacity planning in the foundry. First, issues on capacity planning of the foundry are categorized. Second, focusing on multi-site planning, an increment strategy for the number of auxiliary tools—“photo mask”—is proposed to increase the flexibility of production. The related decisions include how to allocate appropriately the forecast demands of products among multiple sites and how to decide on the production quantities of products in each site after receiving customer-confirmed orders. By constructing the mathematical programming model of capacity planning, the rates of capacity utilization and customer order fulfillment are found to be effectively enhanced by adding new masks to increase production flexibility. Furthermore, from the sensitivity analysis, the importance of customers is shown to influence significantly the amount of reserved capacity of customers. Increasing the number of certified factories is also an indirect way to increase capacity. For long life cycle products, the verification of products in multiple factories in order to increase capacity utilization rate effectively is suggested.
引用
收藏
页码:1213 / 1230
页数:17
相关论文
共 30 条
  • [1] Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry
    Chen, Yin-Yann
    Chen, Tzu-Li
    Liou, Cheng-Dar
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (9-12): : 1213 - 1230
  • [2] Stochastic modelling and optimisation of multi-plant capacity planning problem
    Verma, Anoop
    Shukla, Nagesh
    Tyagi, Satish
    Mishra, Nishikant
    INTERNATIONAL JOURNAL OF INTELLIGENT ENGINEERING INFORMATICS, 2014, 2 (2-3) : 139 - 165
  • [3] CAPACITY AND PRODUCT MIX PLANNING PROBLEM FOR TFT ARRAY MULTI-PLANT
    Lin, James T.
    Chen, Tzu-Li
    Chen, Wei-June
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2007, 24 (06) : 489 - 504
  • [4] Multi-objective production planning in multi-plant environment with uncertain demand and capacity
    Su, Sheng
    Zhan, De-Chen
    Li, Hai-Bo
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (04): : 692 - 697
  • [5] MULTI-SECTORAL MODEL FOR MEDIUM-TERM ECONOMIC PLANNING
    WEIJLAND, H
    DEVELOPMENT AND CHANGE, 1970, 2 (02) : 23 - 36
  • [6] Production and logistics planning considering circulation taxes in a multi-plant seed corn company
    Junqueira, Rogerio A. R.
    Morabito, Reinaldo
    COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2012, 84 : 100 - 110
  • [7] Optimal Medium-Term Hydropower Scheduling Considering Energy and Reserve Capacity Markets
    Helseth, Arild
    Fodstad, Marte
    Mo, Birger
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2016, 7 (03) : 934 - 942
  • [8] A review on medium term capacity planning for semiconductor wafer fabrication
    Geng, Na
    Jiang, Zhibin
    2007 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-8, 2007, : 825 - 829
  • [10] A multi-plant production planning model considering non-repeated setup and aperiodic shipment
    Shen, Guangya
    Luo, Kaiping
    Li, Liheng
    JOURNAL OF MANUFACTURING SYSTEMS, 2020, 57 (57) : 451 - 459