Dynamics-based optimization of rolling schedule aiming at dual goals of chatter suppression and speed increase for a 5-stand cold tandem rolling mill

被引:0
|
作者
Zhi-ying Gao
Bo Tian
Yang Liu
Li-yuan Zhang
Mao-lin Liao
机构
[1] University of Science and Technology Beijing,School of Mechanical Engineering
关键词
Cold tandem rolling; Chatter; Critical rolling speed; Rolling schedule; Dynamics-based optimization; Stability;
D O I
暂无
中图分类号
学科分类号
摘要
In the process of cold tandem rolling, chatter instability leads to serious impacts on enhancing rolling speed, improving product quality, reducing production cost and realizing intellectualization. Chatter occurs with the rolling speed up to a certain threshold value, but the critical speed is determined by both product specifications and rolling schedules. A 5-stand cold tandem rolling mill whose first three stands and subsequent two stands, respectively, have four and six rolls was investigated by formulating its dynamic equations with the corresponding structure–process coupling. By applying the stability-based calculation model about the critical rolling speed in each stand, the system dynamic responses around the critical rolling speed were simulated, and the system eigenvalues which represent instability and characteristic frequencies were figured out. Thereafter, via combining the critical rolling speeds with the system dynamic behavior, a dynamics-based optimization model of rolling schedule for the 5-stand cold tandem system was proposed for the purposes of both the chatter suppression and rolling speed increase. In the optimization model, eight rolling technique parameters (four strip thicknesses and four tensions between the upstream and downstream stands) were taken as design variables, and the constraint conditions were set as no chatter instability in all five stands, and the optimization goal was to maximize the outlet speed of the final stand. The pattern search method was introduced to solve the optimization model. By applying such a dynamics-based optimization model for the 5-stand cold tandem rolling process, the chatter instability was suppressed effectively and the rolling efficiency was improved considerably; therefore, such an optimization model is expected to be valuable for intelligent manufacturing of rolling process.
引用
收藏
页码:168 / 180
页数:12
相关论文
共 11 条
  • [1] Dynamics-based optimization of rolling schedule aiming at dual goals of chatter suppression and speed increase for a 5-stand cold tandem rolling mill
    Gao, Zhi-ying
    Tian, Bo
    Liu, Yang
    Zhang, Li-yuan
    Liao, Mao-lin
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2021, 28 (02) : 168 - 180
  • [2] 5-STAND TANDEM COLD ROLLING-MILL FOR RUSSIAN STEELWORKS
    不详
    METALLURGIA, 1980, 47 (11): : 604 - &
  • [3] PILOT MODEL OF AN ANALOG PROCESS COMPUTER FOR A 5-STAND COLD ROLLING TANDEM MILL
    SCHMIDT, H
    STAHL UND EISEN, 1967, 87 (26): : 1565 - &
  • [4] Computer simulation of flying gage change (FGC) on 5-stand tandem cold rolling mill
    Ge, Ping
    Wang, Li
    Sun, Yikang
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2002, 24 (04):
  • [5] Optimization of Rolling Schedule in Tandem Cold Mill Based on QPSO Algorithm
    Lin, Sen
    Nan, Yurong
    ADVANCES IN ROLLING EQUIPMENT AND TECHNOLOGIES, 2011, 145 : 165 - 170
  • [6] REFRESH OF 5-STAND TANDEM COLD MILL .3. DEVELOPMENT OF NO-DROOPING COLD-ROLLING
    YAMADA, Y
    TESHIBA, T
    YANAGISHIMA, H
    SEINO, Y
    KISHIDA, A
    CHONAN, T
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1983, 23 (12) : B429 - B429
  • [7] Multi-Objective Optimization of Rolling Schedule for Five-Stand Tandem Cold Mill
    Wang, Yunlong
    Wang, Jinkuan
    Yin, Chunhui
    Zhao, Qiang
    IEEE ACCESS, 2020, 8 : 80417 - 80426
  • [8] Multi-objective optimization of rolling schedule based on cost function for tandem cold mill
    Chen Shu-zong
    Zhang Xin
    Peng Liang-gui
    Zhang Dian-hua
    Sun Jie
    Liu Yin-zhong
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (05) : 1733 - 1740
  • [9] Multi-objective optimization of rolling schedule based on cost function for tandem cold mill
    陈树宗
    张欣
    彭良贵
    张殿华
    孙杰
    刘印忠
    JournalofCentralSouthUniversity, 2014, 21 (05) : 1733 - 1740
  • [10] Multi-objective optimization of rolling schedule based on cost function for tandem cold mill
    Shu-zong Chen
    Xin Zhang
    Liang-gui Peng
    Dian-hua Zhang
    Jie Sun
    Yin-zhong Liu
    Journal of Central South University, 2014, 21 : 1733 - 1740