共 50 条
- [4] Stability control of narrow coal pillars in the fully-mechanized gob-side entry during sequenced top coal caving mining [J]. Meitan Xuebao/Journal of the China Coal Society, 2021, 46 (04): : 1211 - 1219
- [7] Stability control of narrow coal pillars in gob-side entry driving for the LTCC with unstable overlying strata: a case study [J]. Arabian Journal of Geosciences, 2018, 11
- [8] Width determination of protection coal pillar of gob-side entry driving in coal mine [J]. Electron. J. Geotech. Eng., 23 (7481-7490):