Assessing process capability index using sampling plan in the presence of measurement system errors

被引:0
|
作者
Adel Brik
Mohamed Goddi
Jamel Dhahri
Nabil Ben Fredj
机构
[1] Université de Tunis,Laboratoire de Mécanique, Matériaux et Procédés (LR99ES05), ENSIT
[2] Ecole Supérieure Privée d’Ingénierie et de Technologie,undefined
[3] ESPRIT,undefined
关键词
Process capability index ; Measurement system error; GR&R; Threshold value of ; Sampling plan parameters;
D O I
暂无
中图分类号
学科分类号
摘要
Measurement system errors impact the collected data used to evaluate the process capability. The work developed in this paper aims at integrating these errors in the calculation of the threshold value of Cpused for making the decision about the process capability Cp0∗\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ \left({C}_{p0}^{\ast}\right) $$\end{document} and to propose a procedure that corrects the parameters of the sampling plan used to estimate this capability index. An expression of Cp0∗\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$ {C}_{p0}^{\ast } $$\end{document}that depends on the gauge repeatability and reproducibility (GR&R), errors type I and type II, the capability index corresponding to the rejectable quality level (CpRQL), and to the acceptable quality level (CpAQL) was developed. The effects of these parameters and their relative interactions on the difference between capability index calculations with and without integrating the measurement system error (ΔCpthreshold) and the corresponding difference in the parts per million of defects ppm (Δppm) were assessed using a response surface design. It was found that the integration of the measurement system error is essential particularly when the difference between CpAQL and CpRQL is small. Concerning the correction of the sampling plan parameters, a procedure was developed to integrate the measurement system error evaluated by the GR&R. This procedure guarantees a common decision concerning the process capability whatever the state of the measurement system is, and this decision would, therefore, depend on the sample quality only.
引用
收藏
页码:3301 / 3313
页数:12
相关论文
共 50 条
  • [1] Assessing process capability index using sampling plan in the presence of measurement system errors
    Brik, Adel
    Goddi, Mohamed
    Dhahri, Jamel
    Ben Fredj, Nabil
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 102 (9-12): : 3301 - 3313
  • [2] A mixed repetitive sampling plan based on process capability index
    Aslam, Muhammad
    Azam, Muhammad
    Jun, Chi-Hyuck
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (24) : 10027 - 10035
  • [3] A Rectifying Acceptance Sampling Plan Based on the Process Capability Index
    Yen, Ching-Ho
    Lee, Chun-Chia
    Lo, Kuo-Hung
    Shiue, Yeou-Ren
    Li, Shu-Hua
    MATHEMATICS, 2020, 8 (01)
  • [4] Multivariate process capability using principal component analysis in the presence of measurement errors
    Scagliarini, Michele
    ASTA-ADVANCES IN STATISTICAL ANALYSIS, 2011, 95 (02) : 113 - 128
  • [5] Acceptance sampling plan for multiple manufacturing lines using EWMA process capability index
    Arif, Osama H.
    Aslam, Muhammad
    Jun, Chi-Hyuck
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2017, 11 (01):
  • [6] Multivariate process capability using principal component analysis in the presence of measurement errors
    Michele Scagliarini
    AStA Advances in Statistical Analysis, 2011, 95 : 113 - 128
  • [7] Multivariate Capability index (MCp) with presence of Gauge Measurement Errors
    Shishebori, Davood
    Hamadani, Ali Zeinal
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7902 - 7905
  • [8] Determination of modified double sampling plan based on the process capability index
    Sridevi, S.
    Jeyadurga, P.
    Balamurali, S.
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2023, 93 (09) : 1441 - 1460
  • [9] SkSP-R sampling plan based on process capability index
    Hussain, Jaffer
    Balamurali, S.
    Aslam, Muhammad
    Jun, Chi-Hyuck
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2017, 46 (06) : 2955 - 2966
  • [10] Multiple Dependent State Sampling Plan Based on Process Capability Index
    Aslam, Muhammad
    Azam, Muhammad
    Jun, Chi-Hyuck
    JOURNAL OF TESTING AND EVALUATION, 2013, 41 (02) : 340 - 346