Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source

被引:0
|
作者
A. V. Skuratov
V. I. Gombolevskii
M. V. Lazarev
A. S. Shabunin
P. A. Berezinets
Yu. S. Vasil’konov
A. N. Sinel’nikov
S. G. Filippov
机构
[1] All-Russia Thermal Engineering Institute (VTI),
[2] Surgut GRES-2 Power Plant,undefined
[3] Branch of PAO Unipro,undefined
来源
Thermal Engineering | 2023年 / 70卷
关键词
startup from zero; steam power unit; technical solutions; external steam supply; heat recovery steam generator calculations; combined cycle unit; tests;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1102 / 1107
页数:5
相关论文
共 4 条
  • [1] Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source
    Skuratov, A. V.
    Gombolevskii, V. I.
    Lazarev, M. V.
    Shabunin, A. S.
    Berezinets, P. A.
    Vasil'konov, Yu. S.
    Sinel'nikov, A. N.
    Filippov, S. G.
    THERMAL ENGINEERING, 2023, 70 (12) : 1102 - 1107
  • [2] Bringing an 800-MW Single Power Plant Unit up to the Live Steam Rated Pressure.
    Gombolevskii, V.I.
    Gonoboblev, A.S.
    Krasantsov, V.N.
    Avrutskii, G.D.
    Doverman, G.I.
    Ostrovetskii, R.M.
    Teploenergetika, 1981, (02): : 36 - 39
  • [4] Investigations of starting TPP-804 boilers for a 800-MW power unit with a sliding pressure throughout the water-steam circuit
    Shvarts, A.L.
    Glusker, B.N.
    Dyadichenko, A.A.
    Sokolov, A.D.
    Serebryanskii, S.S.
    Nosov, B.N.
    Kolbasnikov, A.B.
    Belyakov, I.I.
    Kvetnyi, M.A.
    Posrednik, V.A.
    Rudyka, A.V.
    Thermal Engineering (English translation of Teploenergetika), 1996, 43 (01):