A New Mathematical Programming Formulation for Production Scheduling Optimisation of Sublevel Stoping Operations in the Presence of Pre-concentration Systems

被引:0
|
作者
Farzad Sotoudeh
Micah Nehring
Mehmet Kizil
Peter Knights
Amin Mousavi
机构
[1] University of Queensland,School of Mechanical and Mining Engineering
[2] Tarbiat Modares University,Mining Engineering Department, Faculty of Engineering
来源
关键词
Mathematical programming; Stope sequence; Pre-concentration; Production scheduling; Sublevel stope mining;
D O I
暂无
中图分类号
学科分类号
摘要
Production scheduling in underground mines is one of the most important and complex processes in maximising the economic value of an operation over the life of the mine. Due to increasing energy, transportation, processing and smelting costs and reducing water availability, the extraction of ore deposits through underground operations has become more expensive and challenging. A potential productive and efficient solution to mitigate these issues is to integrate pre-concentration systems into the existing mining system to increase ore grades through a preliminary process of rejecting some waste before sending the ore to the energy intensive mineral processing plant. Further benefit of such systems includes the utilisation of the waste and low-grade material in backfilling of open stopes to reduce the transportation costs and surface environmental impact such as reduction of CO2 emissions and waste transportation. The objective of this paper is to present a new mathematical model to optimise the production schedule of underground metalliferous mining operations in the presence of a pre-concentration system. The proposed model optimises the production schedule and sequencing of stopes within a sublevel stoping operation. The results of this study illustrate the potential economic benefits of using a pre-concentration system prior to a mineral processing operation as a result of increased net present value.
引用
收藏
页码:2255 / 2267
页数:12
相关论文
共 7 条
  • [1] A New Mathematical Programming Formulation for Production Scheduling Optimisation of Sublevel Stoping Operations in the Presence of Pre-concentration Systems
    Sotoudeh, Farzad
    Nehring, Micah
    Kizil, Mehmet
    Knights, Peter
    Mousavi, Amin
    MINING METALLURGY & EXPLORATION, 2023, 40 (6) : 2255 - 2267
  • [2] Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions
    Sotoudeh, Farzad
    Nehring, Micah
    Kizil, Mehmet
    Knights, Peter
    Mousavi, Amin
    RESOURCES POLICY, 2020, 68
  • [3] A New Mathematical Formulation for Underground Cut-off Grade Determination in the Presence of Pre-concentration Systems
    Sotoudeh, Farzad
    Nehring, Micah
    Kizil, Mehmet
    Knights, Peter
    Mousavi, Amin
    NATURAL RESOURCES RESEARCH, 2021, 30 (05) : 3241 - 3259
  • [4] A New Mathematical Formulation for Underground Cut-off Grade Determination in the Presence of Pre-concentration Systems
    Farzad Sotoudeh
    Micah Nehring
    Mehmet Kizil
    Peter Knights
    Amin Mousavi
    Natural Resources Research, 2021, 30 : 3241 - 3259
  • [5] Environmental, Social, and Governance Considerations in Production Scheduling Optimisation for Sublevel Stoping Mining Operations: a Review of Relevant Works and Future Directions
    G. M. Wali Ullah
    Micah Nehring
    Mehmet Kizil
    Peter Knights
    Mining, Metallurgy & Exploration, 2023, 40 : 2167 - 2182
  • [6] Environmental, Social, and Governance Considerations in Production Scheduling Optimisation for Sublevel Stoping Mining Operations: a Review of Relevant Works and Future Directions
    Ullah, G. M. Wali
    Nehring, Micah
    Kizil, Mehmet
    Knights, Peter
    MINING METALLURGY & EXPLORATION, 2023, 40 (6) : 2167 - 2182
  • [7] Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
    Ramazan, S.
    Dimitrakopoulos, R.
    OREBODY MODELLING AND STRATEGIC MINE PLANNING: UNCERTAINTY AND RISK MANAGEMENT MODELS, 2005, (14): : 359 - 365