Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study

被引:0
|
作者
M. Cihat Tuna
机构
[1] Firat University,Civil Engineering Department
关键词
Hydropower; Feasibility report; Ungauged river basin; Cost estimation; Income-expense ratio;
D O I
暂无
中图分类号
学科分类号
摘要
The accurate estimation of long-term resource availability, as represented by discharge, is an essential component of hydropower constructions for generation capacity estimation as well as environment protection on ungauged river basins. Feasibility studies concerning decision-making for various types of items to be used in a hydropower plant on ungauged river basins are important in order to estimate the energy generation, the approximate cost of the project, and the required budget allocation. A feasibility study is necessary which evaluates the energy generation cost, investment and maintenance costs for hydropower projects. The purpose of this study is to analyze the technical feasibility of hydropower plant installations at ungauged sites. A case study is performed to illustrate this investigation. By means of the methodology presented in this research work, it will be possible to carry out sound and successful research to assess the economic feasibility of a hydropower project on ungauged river basins.
引用
收藏
页码:1359 / 1367
页数:8
相关论文
共 50 条
  • [1] Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study
    Tuna, M. Cihat
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (06) : 1359 - 1367
  • [2] Study of Hydroelectric Power Plant Potential of Mahakam River Basin East Kalimantan Indonesia
    Susilowati, Yuliana
    Irasari, Pudji
    Susatyo, Anjar
    [J]. 2019 INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY ENGINEERING AND APPLICATION (ICSEEA): INNOVATIVE TECHNOLOGY TOWARD ENERGY RESILIENCE, 2019, : 207 - 213
  • [3] Economic Assessment of Solar Hydroelectric Hybrid Power Plant a Real Case Study
    Tuna, M. Cihat
    Aytac, Ayca
    [J]. POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2024, 33 (01): : 415 - 423
  • [4] Micro hydroelectric power: Feasibility of a domestic plant
    Archetti, Renata
    [J]. 2011 INTERNATIONAL CONFERENCE ON GREEN BUILDINGS AND SUSTAINABLE CITIES, 2011, 21 : 8 - 15
  • [5] Distribution of Siluriformes in a river under the influence of a small hydroelectric power plant of the Parana River Basin, Brazil
    Garcia, Thiago D.
    Ota, Renata R.
    Ferreira, Dhiego G.
    Nascimento, Raul H. C.
    Galindo, Bruno A.
    Pereira, Larissa S.
    Zanatta, Augusto S.
    [J]. IHERINGIA SERIE ZOOLOGIA, 2020, 110
  • [6] ECONOMICS, POLITICS, AND HYDROELECTRIC POWER - THE PARANA RIVER BASIN
    DAROSA, JE
    [J]. LATIN AMERICAN RESEARCH REVIEW, 1983, 18 (03) : 77 - 107
  • [7] A Feasibility Study of Mini Hydroelectric Power Plant at Sahasradhara Waterfall, Sitakunda, Bangladesh
    Jui, Fahmida Sharmin
    Alam, Sabrina
    Alam, Md. Didarul
    Chowdhury, Sabuj
    [J]. 2015 INTERNATIONAL CONFERENCE ON ADVANCES IN ELECTRICAL ENGINEERING (ICAEE), 2015, : 80 - 83
  • [8] Numerical Approach for Channel Flood Routing in an Ungauged Basin: a Case Study in Kulsi River Basin, India
    Bharali, Biswadeep
    Misra, Utpal Kumar
    [J]. WATER CONSERVATION SCIENCE AND ENGINEERING, 2022, 7 (04) : 389 - 404
  • [9] Numerical Approach for Channel Flood Routing in an Ungauged Basin: a Case Study in Kulsi River Basin, India
    Biswadeep Bharali
    Utpal Kumar Misra
    [J]. Water Conservation Science and Engineering, 2022, 7 : 389 - 404
  • [10] THE INTERRELATIONS OF THE CARONI RIVER BASIN ECOSYSTEMS AND HYDROELECTRIC POWER PROJECTS
    MORALES, LC
    GORZULA, S
    [J]. INTERCIENCIA, 1986, 11 (06) : 272 - 277