Optimisation of shovel-truck haulage system in an open pit using queuing approach

被引:8
|
作者
Elijah K. [1 ]
Joseph G. [1 ]
Samuel M. [2 ]
Mauti D. [1 ]
机构
[1] Departmentof Mining and Mineral Processing Engineering, Taita Taveta University, Voi
[2] Department of Mathematics, Statistics and Physical Sciences, Taita Taveta University, Voi
关键词
Haulage system; Inter-arrival time; Optimisation; Queuing approach; Service rate; Waiting times;
D O I
10.1007/s12517-021-07365-z
中图分类号
学科分类号
摘要
Open-pit mining operations involve loading and hauling of material from the pit to the processing plant or waste dump depending on the ore grade. These two activities account for more than 50% of total operating costs of the mine. There are several loading and hauling systems that are employed depending on the geometry of the ore body. This study applies a shovel-truck haulage system in a limestone open-pit mine to optimise the productivity of the plant using queuing theory technique. This study developed a model using Mat-lab software to calculate the inter-arrival rate and service rate for different numbers of trucks subjected to the same haulage system. The current system used at the limestone cement plant quarry has an inter-arrival rate of 24 trucks/hour and a service rate of 10 trucks/hour with 16 trucks and 2 shovels in the system. Using this data on the developed model, it is evident that when the number of trucks increases to 12, the system daily production increased up to an optimal point of 7644.52 tonnes/day. Thereafter, an increase in the number of trucks reduced the truck productivity, hence reducing the system production and increasing the cost per tonne of material hauled. © 2021, Saudi Society for Geosciences.
引用
收藏
相关论文
共 50 条
  • [1] Modelling open pit shovel-truck systems using the Machine Repair Model
    Krause, A.
    Musingwini, C.
    [J]. Journal of the Southern African Institute of Mining and Metallurgy, 2007, 107 (08) : 469 - 476
  • [2] Modelling open pit shovel-truck systems using the Machine Repair Model
    Krause, A.
    Musingwini, C.
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2007, 107 (08): : 469 - 476
  • [3] Operation Quality Indicators for Shovel-Truck Systems at Open-Pit Coal Mines
    Voronov, Anton
    Voronov, Yuri
    Voronov, Artyom
    Demirel, Nuray
    [J]. IVTH INTERNATIONAL INNOVATIVE MINING SYMPOSIUM, 2019, 105
  • [4] Shovel-truck productivity and efficiency studies for overburden removal in an open-pit coal mine
    Kesimal, A
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1998, 107 : A37 - A40
  • [5] Optimization of shovel-truck system for surface mining
    Ercelebi, S. G.
    Bascetin, A.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2009, 109 (07) : 433 - 439
  • [6] Shovel-truck optimization study in an opencast mine - A queueing approach
    Trivedi, R
    Rai, P
    Nath, R
    [J]. INDIAN JOURNAL OF ENGINEERING AND MATERIALS SCIENCES, 1999, 6 (03) : 153 - 157
  • [7] Estimation of large open pit haulage truck requirements
    Blackwell, GH
    [J]. CIM BULLETIN, 1999, 92 (1028): : 143 - 149
  • [8] A MICROCOMPUTER APPROACH FOR SIMULATING TRUCK HAULAGE SYSTEMS IN OPEN-PIT MINING
    CASTILLO, D
    COCHRAN, JK
    [J]. COMPUTERS IN INDUSTRY, 1987, 8 (01) : 37 - 47
  • [9] Research on the method of determining the block size for an open-pit mine integrating mining parameters and shovel-truck's operation efficiency
    Guo, Weiqiang
    Liu, Guangwei
    Li, Jiaming
    Chai, Senlin
    Guo, Shupeng
    [J]. SCIENTIFIC REPORTS, 2024, 14 (01):
  • [10] DETERMINATION OF HAULAGE TRUCK REQUIREMENTS FOR AN OPEN-PIT OPERATION
    PLAISTOWE, RHA
    ALGEO, MB
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1979, 79 (07): : 185 - 190