Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II

被引:1
|
作者
Jianping Dou
Jun Li
Chun Su
机构
[1] Southeast University,School of Mechanical Engineering
[2] Southeast University,School of Automation
关键词
Reconfigurable flow line; Integrated optimization modeling; Configuration generation; Scheduling; NSGA-II;
D O I
暂无
中图分类号
学科分类号
摘要
Reconfigurable manufacturing system (RMS) is a new manufacturing system paradigm suited to the era of mass customization. A RMS is able to change its configuration by physical reconfiguration and/or logical reconfiguration, to provide exact functionality and capacity needed for every demand period. For the reconfigurable flow line (RFL) in which multiple parts within the same part family can be produced simultaneously, optimal design of physical configuration (called configuration generation) and proper scheduling of multiple products are crucial to operate RFL in a cost-effective manner. Considering the close coupling between configuration generation and scheduling of multiple products for RFL, a new multi-objective mixed integer programming model is established for the integrated optimization of configuration generation and scheduling. The two conflicting objectives are to minimize total cost including capital cost and reconfiguration cost and to minimize total tardiness. The validity of the model is verified through case analysis implemented by LINGO software. Subsequently, the nondominated sorting genetic algorithm II (NSGA-II) is adopted to obtain a set of nondominated solutions. In the NSGA-II, a hybrid encoding method ensuring any chromosome a feasible solution is devised. Case study is utilized to illustrate the effectiveness of the NSGA-II for solving the problem. The case study also reveals that only if performing configuration generation and scheduling concurrently can a set of solutions balancing cost and tardiness be identified effectively for the RFL.
引用
收藏
页码:1945 / 1962
页数:17
相关论文
共 50 条
  • [1] Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II
    Dou, Jianping
    Li, Jun
    Su, Chun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 86 (5-8): : 1945 - 1962
  • [2] Bi-objective Portfolio Optimization Using a Customized Hybrid NSGA-II Procedure
    Deb, Kalyanmoy
    Steuer, Ralph E.
    Tewari, Rajat
    Tewari, Rahul
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, 2011, 6576 : 358 - +
  • [3] Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop
    Niu, Wei
    Li, Jun-qing
    Jin, Hui
    Qi, Rui
    Sang, Hong-yan
    ENGINEERING OPTIMIZATION, 2023, 55 (05) : 719 - 740
  • [4] Performance Comparison of NSGA-II and NSGA-III on Bi-objective Job Shop Scheduling Problems
    dos Santos, Francisco
    Costa, Lino A.
    Varela, Leonilde
    OPTIMIZATION, LEARNING ALGORITHMS AND APPLICATIONS, PT I, OL2A 2023, 2024, 1981 : 531 - 543
  • [5] Solving bi-objective integrated scheduling problem of production, inventory and distribution using a modified NSGA-II
    Luo, Qiang
    Fan, Qing
    Deng, Qianwang
    Guo, Xin
    Gong, Guiliang
    Liu, Xiahui
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 225
  • [6] Novel NSGA-II and SPEA2 Algorithms for Bi-Objective Inventory Optimization
    Huseyinov, Ilham
    Bayrakdar, Ali
    STUDIES IN INFORMATICS AND CONTROL, 2022, 31 (03): : 31 - 42
  • [7] Bi-objective optimization for a multistate job-shop production network using NSGA-II and TOPSIS
    Lin, Yi-Kuei
    Chang, Ping-Chen
    Yeng, Louis Cheng-Lu
    Huan, Shang-Fu
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 52 : 43 - 54
  • [8] Applying modified NSGA-II for bi-objective supply chain problem
    Bandyopadhyay, Susmita
    Bhattacharya, Ranjan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (04) : 707 - 716
  • [9] Applying modified NSGA-II for bi-objective supply chain problem
    Susmita Bandyopadhyay
    Ranjan Bhattacharya
    Journal of Intelligent Manufacturing, 2013, 24 : 707 - 716
  • [10] A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem
    H. Asefi
    F. Jolai
    M. Rabiee
    M. E. Tayebi Araghi
    The International Journal of Advanced Manufacturing Technology, 2014, 75 : 1017 - 1033