Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain

被引:0
|
作者
Natashia Boland
Thomas Kalinowski
Hamish Waterer
Lanbo Zheng
机构
[1] University of Newcastle,School of Mathematical & Physical Sciences
来源
Journal of Scheduling | 2013年 / 16卷
关键词
Maintenance scheduling; Coal supply chain; Capacity alignment; Network flow; Mixed integer programming;
D O I
暂无
中图分类号
学科分类号
摘要
We consider the scheduling of the annual maintenance for the Hunter Valley Coal Chain. The coal chain is a system comprising load points, railway track and different types of terminal equipment, interacting in a complex way. A variety of maintenance tasks have to be performed on all parts of the infrastructure on a regular basis in order to assure the operation of the system as a whole. The main objective in the planning of these maintenance jobs is to maximize the total annual throughput. Based on a network flow model of the system, we propose a mixed integer programming formulation for this planning task. In order to deal with the resulting large scale model which cannot be solved directly by a general purpose solver, we propose two steps. The number of binary variables is reduced by choosing a representative subset of the variables of the original problem, and a rolling horizon approach enables the approximation of the long term (i.e. annual) problem by a sequence of shorter problems (for instance, monthly).
引用
收藏
页码:649 / 659
页数:10
相关论文
共 50 条
  • [1] Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain
    Boland, Natashia
    Kalinowski, Thomas
    Waterer, Hamish
    Zheng, Lanbo
    [J]. JOURNAL OF SCHEDULING, 2013, 16 (06) : 649 - 659
  • [2] A mixed integer programming model for long term capacity expansion planning: A case study from The Hunter Valley Coal Chain
    Singh, Gaurav
    Sier, David
    Ernst, Andreas T.
    Gavriliouk, Olena
    Oyston, Rob
    Giles, Tracey
    Welgama, Palitha
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 220 (01) : 210 - 224
  • [3] Mixed-Integer Linear Programming based Maintenance Scheduling of Generating Units
    Nezhad, Ali Esmaeel
    Nardelli, Pedro H. J.
    Ghanavati, Farideh
    Sahoo, Subham
    Osorio, Gerardo J.
    [J]. 2022 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2022 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2022,
  • [4] Modelling the Capacity of the Hunter Valley Coal Chain to Support Capacity Alignment of Maintenance Activities
    Boland, N.
    McGowan, B.
    Mendes, A.
    Rigterink, F.
    [J]. 20TH INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2013), 2013, : 3302 - 3308
  • [5] A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem
    Pour, Shahrzad M.
    Drake, John H.
    Ejlertsen, Lena Secher
    Rasmussen, Kourosh Marjani
    Burke, Edmund K.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 269 (01) : 341 - 352
  • [6] The scheduling of maintenance. A resource-constraints mixed integer linear programming model
    Manzini, Riccardo
    Accorsi, Riccardo
    Cennerazzo, Teresa
    Ferrari, Emilio
    Maranesi, Fausto
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 561 - 568
  • [7] MACHINE SCHEDULING WITH MIXED INTEGER GOAL PROGRAMMING
    HERSHAUER, JC
    GOWENS, JW
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1977, 5 (05): : 609 - 610
  • [8] MINE SCHEDULING OPTIMIZATION WITH MIXED INTEGER PROGRAMMING
    GERSHON, ME
    [J]. MINING ENGINEERING, 1983, 35 (04) : 351 - 354
  • [9] Scheduling staff using mixed integer programming
    Beaumont, N
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 98 (03) : 473 - 484
  • [10] RAIL SCHEDULE OPTIMISATION IN THE HUNTER VALLEY COAL CHAIN
    Singh, Gaurav
    Ernst, Andreas T.
    Baxter, Matthew
    Sier, David
    [J]. RAIRO-OPERATIONS RESEARCH, 2015, 49 (02) : 413 - 434