An exact algorithm for scheduling identical coupled tasks

被引:27
|
作者
Ahr D. [1 ]
Békési J. [2 ]
Galambos G. [2 ]
Oswald M. [1 ]
Reinelt G. [1 ]
机构
[1] Institute of Computer Science, University of Heidelberg, D-69120 Heidelberg
[2] Department of Informatics, Juhász Gyula Teacher's Training College, University of Szeged, H-6720 Szeged
关键词
Coupled Tasks; Dynamic Programming; Scheduling;
D O I
10.1007/s001860300328
中图分类号
学科分类号
摘要
The coupled task problem is to schedule n jobs on one machine where each job consists of two subtasks with required delay time between them. The objective is to minimize the makespan. This problem was analyzed in depth by Orman and Potts [3]. They investigated the complexity of different cases depending on the lengths a i and b i of the two subtasks and the delay time L i . [InlineMediaObject not available: see fulltext.][InlineMediaObject not available: see fulltext.]-hardness proofs or polynomial algorithms were given for all cases except for the one where a i =a, b i =b and L i =L. In this paper we present an exact algorithm for this problem with time complexity O(nr 2L ) where [InlineMediaObject not available: see fulltext.] holds. Therefore the algorithm is linear in the number of jobs for fixed L. © Springer-Verlag 2004.
引用
收藏
页码:193 / 203
页数:10
相关论文
共 50 条
  • [1] Scheduling coupled tasks on parallel identical machines
    Khatami, Mostafa
    Oron, Daniel
    Salehipour, Amir
    OPTIMIZATION LETTERS, 2024, 18 (04) : 991 - 1003
  • [2] Scheduling coupled tasks on parallel identical machines
    Mostafa Khatami
    Daniel Oron
    Amir Salehipour
    Optimization Letters, 2024, 18 : 991 - 1003
  • [3] New characterizations for the identical coupled tasks scheduling problem
    Hadda, Hatem
    Abdessalem, Mhamed
    RAIRO-OPERATIONS RESEARCH, 2023, 57 (02) : 325 - 332
  • [4] A note on scheduling identical coupled tasks in logarithmic time
    Baptiste, Philippe
    DISCRETE APPLIED MATHEMATICS, 2010, 158 (05) : 583 - 587
  • [5] An exact algorithm for the identical parallel machine scheduling problem
    Mokotoff, E
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (03) : 758 - 769
  • [6] Quick algorithm for independent tasks scheduling on identical parallel processors
    Li, Xiao-Ping
    Xu, Xiao-Fei
    Zhan, De-Chen
    Ruan Jian Xue Bao/Journal of Software, 2002, 13 (04): : 812 - 817
  • [7] An exact algorithm for identical parallel machine scheduling under scenarios
    Xie Han-Xin
    Wang Bing
    2020 3RD WORLD CONFERENCE ON MECHANICAL ENGINEERING AND INTELLIGENT MANUFACTURING (WCMEIM 2020), 2020, : 341 - 344
  • [8] A 5/4-approximation algorithm for scheduling identical malleable tasks
    Decker, T.
    Luecking, T.
    Monien, B.
    THEORETICAL COMPUTER SCIENCE, 2006, 361 (2-3) : 226 - 240
  • [9] A 5/4-approximation algorithm for scheduling identical malleable tasks
    Decker, T
    Lücking, T
    Monien, B
    APPROXIMATION AND ONLINE ALGORITHMS, 2004, 2909 : 95 - 108
  • [10] SCHEDULING COUPLED TASKS
    SHAPIRO, RD
    NAVAL RESEARCH LOGISTICS, 1980, 27 (03) : 489 - 498