Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects

被引:0
|
作者
Ji-Bo Wang
Li-Han Zhang
Zheng-Guo Lv
Dan-Yang Lv
Xin-Na Geng
Xinyu Sun
机构
[1] Shenyang Aerospace University,School of Computer Science
[2] Xi’an Jiaotong University,School of Management
来源
关键词
Scheduling; Branch-and-bound; Learning effect; Tabu search; Simulated annealing; 90B35; 90C26;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses single-machine scheduling problems with truncated learning effects. The objective is to determine the optimal job schedule such that the makespan, the total weighted completion time and the maximum lateness are to be minimized. All the considered problems are NP-hard; hence, for each problem, we propose the heuristic and branch-and-bound algorithms. Extensive numerical experiments validate the efficiency of the proposed solution algorithms on a set of randomly generated instances.
引用
收藏
相关论文
共 50 条
  • [1] Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects
    Wang, Ji-Bo
    Zhang, Li-Han
    Lv, Zheng-Guo
    Lv, Dan-Yang
    Geng, Xin-Na
    Sun, Xinyu
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2022, 41 (08):
  • [2] Several single-machine scheduling problems with general learning effects
    Lu, Yuan-Yuan
    Wei, Cai-Min
    Wang, Ji-Bo
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (11) : 5650 - 5656
  • [3] Exact algorithms for single-machine scheduling problems with a variable maintenance
    Ying, Kuo-Ching
    Lu, Chung-Cheng
    Chen, Jhao-Cheng
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 427 - 433
  • [4] Single-machine group scheduling with general linear deterioration and truncated learning effects
    Yin, Na
    Gao, Ming
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2024, 43 (06):
  • [5] On exact algorithms for single-machine scheduling problems with a variable maintenance
    Wang, Qi
    Liu, Aihua
    Xiao, Junfang
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 276 - 279
  • [6] Some single-machine scheduling problems with general effects of learning and deterioration
    Yin, Yunqiang
    Xu, Dehua
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (01) : 100 - 108
  • [7] Single-Machine Group Scheduling Problems with General Deterioration and Linear Learning Effects
    Ning, Lei
    Sun, Li
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2023, 2023
  • [8] Exact and heuristic algorithms for minimizing Tardy/Lost penalties on a single-machine scheduling problem
    Kianfar, K.
    Moslehi, G.
    Nookabadi, A. S.
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (02): : 867 - 895
  • [9] Exact and heuristic algorithms for minimizing Tardy/Lost penalties on a single-machine scheduling problem
    K. Kianfar
    G. Moslehi
    A. S. Nookabadi
    [J]. Computational and Applied Mathematics, 2018, 37 : 867 - 895
  • [10] Single-machine scheduling problems with the effects of learning and deterioration
    Wang, Ji-Bo
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04): : 397 - 402