Pantograph and catenary system with double pantographs for high-speed trains at 350 km/h or higher

被引:0
|
作者
Weihua Zhang
Ning Zhou
Ruiping Li
Guiming Mei
Dongli Song
机构
[1] Southwest Jiaotong University,Traction Power State Key Laboratory
来源
Journal of Modern Transportation | 2011年 / 19卷 / 1期
关键词
catenary; pantograph; dynamic performance; double pantographs;
D O I
10.1007/BF03325734
中图分类号
学科分类号
摘要
The paper is aimed at developing an optimized design of the pantograph and catenary system with double pantographs at a speed of 350 km/h for the Wuhan-Guangzhou high-speed railway. First, the pantograph and catenary system for the Beijing-Tianjin high-speed railway was analyzed to verify whether its design objective could be fulfilled. It shows that the system is not able to satisfy the requirement of a sustainable running speed of 350 km/h. Then a new scheme for the pantograph and catenary system is proposed through optimization and renovation of the structure and parameters of the pantograph and catenary system, including the suspension type of the catenary, tension of the contact wire, and space between two pantographs. Finally, the dynamic performance of the new system was verified by simulation and line testing. The results show that the new scheme of the pantograph and catenary system for the Wuhan-Guangzhou high-speed railway is acceptable, in which the steady contact between the rear pantograph and the catenary at the space of 200 m can be maintained to ensure the current-collection quality. A current collection with double pantographs at a speed of 350 km/h or higher can be achieved.
引用
收藏
页码:7 / 11
页数:4
相关论文
共 50 条
  • [1] Pantograph and catenary system with double pantographs for high-speed trains at 350 km/h or higher
    Zhang, Weihua
    Zhou, Ning
    Li, Ruiping
    Mei, Guiming
    Song, Dongli
    JOURNAL OF MODERN TRANSPORTATION, 2011, 19 (01): : 7 - 11
  • [3] Optimization of high-speed railway pantographs for improving pantograph-catenary contact
    Jorge Ambrósio
    Joo Pombo
    Manuel Pereira
    Theoretical & Applied Mechanics Letters, 2013, 3 (01) : 51 - 57
  • [4] An Investigation into the Characteristics of a Novel Rotatable Pantograph Catenary System for High-Speed Trains
    Xiao, Song
    Luo, Yuanpei
    Wu, Jingchi
    Zhang, Can
    Rao, Yang
    Wu, Guangning
    Deng, Zhida
    Sykulski, Jan K.
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2021, 16 (03) : 1721 - 1730
  • [5] Influence of the aerodynamic forces on the pantograph-catenary system for high-speed trains
    Pombo, J.
    Ambrosio, J.
    Pereira, M.
    Rauter, F.
    Collina, A.
    Facchinetti, A.
    VEHICLE SYSTEM DYNAMICS, 2009, 47 (11) : 1327 - 1347
  • [6] An Investigation into the Characteristics of a Novel Rotatable Pantograph Catenary System for High-Speed Trains
    Song Xiao
    Yuanpei Luo
    Jingchi Wu
    Can Zhang
    Yang Rao
    Guangning Wu
    Zhida Deng
    Jan K. Sykulski
    Journal of Electrical Engineering & Technology, 2021, 16 : 1721 - 1730
  • [7] Optimization of high-speed railway pantographs for improving pantograph-catenary contact
    Ambrosio, Jorge
    Pombo, Joao
    Pereira, Manuel
    THEORETICAL AND APPLIED MECHANICS LETTERS, 2013, 3 (01) : 013006
  • [8] PANTOGRAPH-CATENARY DYNAMICS SIMULATION FOR HIGH-SPEED TRAINS
    Spiroiu, Marius-Adrian
    ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2024, 67 (02): : 779 - 786
  • [9] Study on current-collection of high-speed pantograph-catenary system and distance between two pantographs
    Wu Y.
    Wu J.-Y.
    Zheng J.-H.
    Song H.-L.
    Zheng Q.-L.
    Tiedao Xuebao/Journal of the China Railway Society, 2010, 32 (04): : 38 - 43
  • [10] Multi-physics analysis of a novel circular pantograph catenary system for high-speed trains
    Xiao, Song
    Luo, Yuanpei
    Wu, Jingchi
    Zhang, Can
    Rao, Yang
    Wu, Guangning
    Sykulski, Jan
    COMPEL-THE INTERNATIONAL JOURNAL FOR COMPUTATION AND MATHEMATICS IN ELECTRICAL AND ELECTRONIC ENGINEERING, 2021, 40 (02) : 95 - 108