A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020

被引:0
|
作者
Shohreh Moradi
Ramin Ansari
Roohollah Taherkhani
机构
[1] Imam Khomeini International University,Department of Civil Engineering, Faculty of Technical and Engineering
关键词
Performance management; Construction projects; Key performance indicators; Systematic literature review;
D O I
暂无
中图分类号
学科分类号
摘要
Today, the construction industry has to turn into one of the major industries, which covers a wide range of dependent industries. Rapid changes in the construction environment require a great deal of effort for a company or organization to maintain survival and growth. The life of companies and organizations in the field of construction depends on the way they manage their projects. Achieving project success is a major goal of project managers. A method of evaluating and controlling the project success is to apply project performance management. As a result of the studies, the most important key performance indicators, their relevant sources and references, and the relationships related to the quantification of indicators and their relationships with each other have been introduced and described. These results could help researchers in the future to obtain information and resources related to each index. Safety, environment, cost, profitability, scheduling, productivity, sustainability, quality, client satisfaction, and team satisfaction are the most important indicators.
引用
收藏
页码:15 / 31
页数:16
相关论文
共 50 条
  • [1] A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020
    Moradi, Shohreh
    Ansari, Ramin
    Taherkhani, Roohollah
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (01) : 15 - 31
  • [2] Management's perception of key performance indicators for construction
    Cox, RF
    Issa, RRA
    Ahrens, D
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 142 - 151
  • [3] Systematic key performance indicators for measuring modular integrated construction
    Zhang, Zhiqian
    Xie, Mingcheng
    Pan, Wei
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2022, 175 (03) : 113 - 128
  • [4] Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction
    Lin, Gongbo
    Shen, Geoffrey Qiping
    Sun, Ming
    Kelly, John
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (09): : 698 - 706
  • [5] Key performance indicators for hospital planning and construction: a systematic review and meta-analysis
    Liu, Wenque
    Chan, Albert P. C.
    Chan, Man Wai
    Darko, Amos
    Oppong, Goodenough D.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [6] Development of Key Performance Indicators for Measuring the Management Performance of Small Construction Firms in Korea
    Kim, Doyeong
    Oh, Wongyun
    Yun, Jiyeong
    Youn, Jongyoung
    Do, Sunglok
    Lee, Donghoon
    [J]. SUSTAINABILITY, 2021, 13 (11)
  • [7] Key performance indicators of value management in the Sri Lankan construction industry
    Madushika, W. H. S.
    Perera, B. A. K. S.
    Ekanayake, B. J.
    Shen, G. Q. P.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (02) : 157 - 168
  • [8] Key performance indicators of OR efficiency. Myths and evidence of key performance indicators in OR management
    Schuster, M.
    Wicha, L. L.
    Fiege, M.
    [J]. ANAESTHESIST, 2007, 56 (03): : 259 - 271
  • [9] Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis
    Horta, Isabel M.
    Camanho, Ana S.
    Da Costa, Jorge Moreira
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (05): : 581 - 594
  • [10] Key Performance Indicators in Highway Design and Construction
    Molenaar, Keith R.
    Navarro, Desiderio
    [J]. TRANSPORTATION RESEARCH RECORD, 2011, (2228) : 51 - 58