Environmental impact of blasting at Drenovac limestone quarry (Serbia)

被引:0
|
作者
Dejan Vasović
Srđan Kostić
Marina Ravilić
Slobodan Trajković
机构
[1] University of Belgrade,Department of Architectural Technologies, Faculty of Architecture
[2] University of Belgrade,Department of Geology, Faculty of Mining and Geology
[3] University of Belgrade,Department of Underground Mining, Faculty of Mining and Geology
来源
关键词
Blasting; Peak particle velocity; Artificial neural network; Frequency; Building vibration;
D O I
暂无
中图分类号
学科分类号
摘要
In present paper, the blast-induced ground motion and its effect on the neighboring structures are analyzed at the limestone quarry "Drenovac" in central part of Serbia. Ground motion is examined by means of existing conventional predictors, with scaled distance as a main influential parameter, which gave satisfying prediction accuracy (R > 0.8), except in the case of Ambraseys–Hendron predictor. In the next step of the analysis, a feed-forward three-layer back-propagation neural network is developed, with three input units (total charge, maximum charge per delay and distance from explosive charge to monitoring point) and only one output unit (peak particle velocity). The network is tested for the cases with different number of hidden nodes. The obtained results indicate that the model with six hidden nodes gives reasonable predictive precision (R ≈ 0.9), but with much lower values of mean-squared error in comparison to conventional predictors. In order to predict the influence level to the neighboring buildings, recorded peak particle velocities and frequency values were evaluated according to United States Bureau of Mines, USSR standard, German DIN4150, Australian standard, Indian DMGS circular 7 and Chinese safety regulations for blasting. Using the best conventional predictor, the relationship between the allowable amount of explosive and distance from explosive charge is determined for every vibration standard. Furthermore, the effect of air-blast overpressure is analyzed according to domestic regulations, with construction of a blasting chart for the permissible amount of explosive as a function of distance, for the allowable value of air-blast overpressure (200 Pa). The performed analysis indicates only small number of recordings above the upper allowable limit according to DIN4150 and DMGS standard, while, for all other vibration codes the registered values of ground velocity are within the permissible limits. As for the air-blast overpressure, no damage is expected to occur.
引用
收藏
页码:3915 / 3928
页数:13
相关论文
共 50 条
  • [1] Environmental impact of blasting at Drenovac limestone quarry (Serbia)
    Vasovic, Dejan
    Kostic, Srdan
    Ravilic, Marina
    Trajkovic, Slobodan
    [J]. ENVIRONMENTAL EARTH SCIENCES, 2014, 72 (10) : 3915 - 3928
  • [2] Control of fines through blasting design at a limestone quarry
    Adhikari, G.R.
    Barman, B.K.
    Singh, B.
    [J]. Mining science & technology, 1990, 11 (02): : 173 - 177
  • [3] Evaluation of ground vibrations induced by blasting in a limestone quarry
    Paurush, Punit
    Rai, Piyush
    [J]. CURRENT SCIENCE, 2022, 122 (11): : 1279 - 1287
  • [4] Environmental impact assessment of limestone quarry using multispectral satellite imagery
    Vignesh Kumar
    Kiran Yarrakula
    [J]. Earth Science Informatics, 2022, 15 : 1905 - 1923
  • [5] Primary blasting in a limestone quarry: physicochemical characterization of the dust clouds
    Jones, T
    Morgan, A
    Richards, R
    [J]. MINERALOGICAL MAGAZINE, 2003, 67 (02) : 153 - 162
  • [6] DEVELOPMENT OF THE KUZ-RAM MODEL TO BLASTING IN A LIMESTONE QUARRY
    Tosun, Abdurrahman
    Konak, Gurcan
    Toprak, Tugce
    Karakus, Dogan
    Onur, Ahmet Hakan
    [J]. ARCHIVES OF MINING SCIENCES, 2014, 59 (02) : 477 - 488
  • [7] Environmental impact assessment of limestone quarry using multispectral satellite imagery
    Kumar, Vignesh
    Yarrakula, Kiran
    [J]. EARTH SCIENCE INFORMATICS, 2022, 15 (03) : 1905 - 1923
  • [8] PREDICTION OF BOULDER COUNT IN LIMESTONE QUARRY BLASTING: STATISTICAL MODELING APPROACH
    P. Y. Dhekne
    M. Pradhan
    R. K. Jade
    R. Mishra
    [J]. Journal of Mining Science, 2020, 56 : 771 - 783
  • [9] PREDICTION OF BOULDER COUNT IN LIMESTONE QUARRY BLASTING: STATISTICAL MODELING APPROACH
    Dhekne, P. Y.
    Pradhan, M.
    Jade, R. K.
    Mishra, R.
    [J]. JOURNAL OF MINING SCIENCE, 2020, 56 (05) : 771 - 783
  • [10] Analysis of parameters of ground vibration produced from bench blasting at a limestone quarry
    Kahriman, A
    [J]. SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2004, 24 (11) : 887 - 892