Project Risk Factors Facing Construction Management Firms

被引:0
|
作者
Kyungmo Park
Hyun Woo Lee
Kunhee Choi
Seung-Hyun Lee
机构
[1] Hanyang University,Innovation Durable Building and Infrastructure Research Center
[2] University of Washington,Department of Construction Management
[3] Texas A&M University,Department of Construction Science
[4] Hong-ik University,School of Architectural Engineering
关键词
Risk management; Construction management; Risk factors; Analytic hierarchy process; Failure mode and effects analysis; Korea;
D O I
暂无
中图分类号
学科分类号
摘要
Very little is known about the project risk factors that affect construction management (CM) firms, which often struggle due to a lack of effective risk management practices. This study investigates the risk factors critical to project execution in CM firms and ranks them using the analytic hierarchy process (AHP) and failure mode and effects analysis (FMEA) methods. Interviews with executives at the top 15 Korean CM firms are carried out to identify major risk factors in the CM sector, and a survey is used to develop priority ranking. We find that payment delays and project delays are the two most critical risk factors affecting CM firms because of (1) lack of communication between headquarters and field offices, (2) shift of responsibility from headquarters to a field office, (3) absence of regular monitoring of project progress, and (4) ex-post management practices. The findings presented in this study should assist CM firms in establishing more robust risk management practices, thereby improving firms’ profitability, project performance, and customer satisfaction.
引用
收藏
页码:305 / 321
页数:16
相关论文
共 50 条
  • [1] Project Risk Factors Facing Construction Management Firms
    Park, Kyungmo
    Lee, Hyun Woo
    Choi, Kunhee
    Lee, Seung-Hyun
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (3A) : 305 - 321
  • [2] Project risk management in Iranian small construction firms
    Amani N.
    Safarzadeh K.
    [J]. Journal of Engineering and Applied Science, 2022, 69 (01):
  • [3] Risk Factors Affecting Equipment Management in Construction Firms
    Cuong Phu Pham
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    Loan Phuc Le
    My Tien Ha Duong
    [J]. JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (11): : 347 - 356
  • [4] Project Management Maturity Models for Construction Firms
    Machado, Filipe
    Duarte, Nelson
    Amaral, Antonio
    Barros, Teresa
    [J]. JOURNAL OF RISK AND FINANCIAL MANAGEMENT, 2021, 14 (12)
  • [5] Project Management Maturity in Renovation and Remodelling Construction Firms
    Machado, Filipe
    Duarte, Nelson
    Amaral, Antonio
    [J]. BUILDINGS, 2023, 13 (02)
  • [6] Project risk management methodology for small firms
    Marcelino-Sadaba, Sara
    Perez-Ezcurdia, Amaya
    Echeverria Lazcano, Angel M.
    Villanueva, Pedro
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (02) : 327 - 340
  • [7] Behavioral factors of construction project management
    Zhao, Xiaohong
    Chen, Liwen
    [J]. INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, VOLS 1 & 2, 2014, : 903 - 909
  • [8] Risk management process in construction project
    Liu Renhui
    Tai Shuangliang
    Zhao Qingjie
    [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 843 - 846
  • [9] Factors Influencing Enterprise Risk Management Implementation of Construction Firms in Lagos State, Nigeria
    Oyeyipo, Opeyemi Olanrewaju
    Osuizugbo, Innocent Chigozie
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2023, 28 (02)
  • [10] Evaluation of the impact of risk management on project performance in small construction firms in South Africa The case study of construction systems
    Amoah, Christopher
    Pretorius, Leon
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 18 (03) : 611 - 634