The Cassini Grand Finale Mission: Planning for a New Mission Environment

被引:0
|
作者
Vandermey, Nancy [1 ]
Heventhal, William [1 ]
Ray, Trina [1 ]
机构
[1] CALTECH, Jet Prop Lab, 4800 Oak Grove Dr, Pasadena, CA 91109 USA
基金
美国国家航空航天局;
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
The Cassini F-Ring & Proximal Orbits (FRPO) is a new and unique mission; to ensure the highest priority science gets implemented, the POST (Proximal Orbit Science Team) was created to pre-allocate the time around periapse for all 22 proximal orbits. The F-ring orbits, and proximal time outside of POST, were handled similar to Cassini's Solstice Mission using the Pre-Integrated Event (PIE) process. The new and unique properties of the spacecraft's trajectory required much forethought to be flown safely while still planning for the most and best science return possible. Some ring-plane crossings (RPX) will be protected against dust impacts by turning the high gain antenna (HGA) to the dust RAM direction (HGA2RAM). If on the first proximal RPX higher than expected dust readings are seen then the Project Office may choose to require more (all) subsequent RPX to be HGA2RAM, implemented via a real-time command overlay for uplinked sequences. The pointing uncertainties will be larger than usual after the final targeted flyby; some of the process changes to address this include adding extra orbit trim maneuvers (OTMs) (fuel permitting) to resync to the reference trajectory and reduce pointing uncertainties; and movable blocks of commands to be used for some periapses where atmospheric drag may cause large timing shifts Changes made for FRPO to address perceptions that these sequences will be hard to implement include requiring early pointing designs (during integration) for certain types of observations, requiring teams to check early on that they can turn to and from their observation attitude, and that their attitude is safe, and adjusting the Implementation process to give more time for science observation designers. This paper will discuss these process changes and lessons learned so far.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Cassini's Grand Finale: A Mission Planning Retrospective
    Sturm, Erick J., II
    [J]. 2018 IEEE AEROSPACE CONFERENCE, 2018,
  • [2] Cassini's Grand Finale
    Edgington, Scott G.
    Spilker, Linda J.
    [J]. NATURE GEOSCIENCE, 2016, 9 (07) : 472 - 473
  • [3] Cassini's grand finale
    Colwell, Joshua
    [J]. PHYSICS WORLD, 2017, 30 (09) : 25 - 28
  • [4] Cassini's Grand Finale
    Scott G. Edgington
    Linda J. Spilker
    [J]. Nature Geoscience, 2016, 9 : 472 - 473
  • [5] Cassini mission to Saturn caps era of grand spacecraft
    Dornheim, MA
    [J]. AVIATION WEEK & SPACE TECHNOLOGY, 1996, 145 (24): : 71 - +
  • [6] CASSINI ORBIT DETERMINATION OPERATIONS THROUGH THE FINAL TITAN FLYBYS AND THE MISSION GRAND FINALE (FEBRUARY 2016-SEPTEMBER 2017)
    Bellerose, Julie
    Roth, Duane
    Boone, Dylan
    Tarzi, Zahi
    Ionasescu, Radica
    Criddle, Kevin
    [J]. GUIDANCE, NAVIGATION, AND CONTROL 2018, PTS I-II: ADVANCES IN THE ASTRONAUTICAL SCIENCES, 2018, 164 : 1195 - 1206
  • [7] The planning of optical navigation pictures for the Cassini extended mission
    Gillam, Stephen D.
    Ionasescu, Rodica
    Williams, Powtawche
    [J]. SPACEFLIGHT MECHANICS 2008, VOL 130, PTS 1 AND 2, 2008, 130 : 2003 - 2018
  • [8] Contingency Planning for Cassini's Final Mission Phase
    Sturm, Erick J., II
    [J]. 2016 IEEE AEROSPACE CONFERENCE, 2016,
  • [9] OPTICAL NAVIGATION PLANNING PROCESS FOR THE CASSINI SOLSTICE MISSION
    Nolet, Simon
    Gillam, Stephen D.
    Jones, Jeremy B.
    [J]. SPACEFLIGHT MECHANICS 2011, PTS I-III, 2011, 140 : 1655 - +
  • [10] The Cassini mission to Saturn
    Spehalski, RJ
    [J]. CASSINI/HUYGENS: A MISSION TO THE SATURNIAN SYSTEMS, 1996, 2803 : 2 - 9