Focus on product quality key to cutting cycle times

被引:0
|
作者
Lokas, Karim [1 ]
机构
[1] Camstar Syst Inc, Charlotte, NC 28277 USA
关键词
Semiconductor device manufacture - Process engineering - Solar power generation - Quality control;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Leading-edge industries such as solar (i.e., photovoltaic or PV) and semiconductor manufacturing have made a concerted effort to shorten cycle times to improve process and production efficiencies as a means to gain competitive advantage. Many tools have been proposed for reducing cycle times: automation, six sigma, lean manufacturing, and better synchronization between demand and supply. Product quality permeates all these tools. Product quality or the lack of it has a direct and significant impact on total cycle times and lead times. It's time that manufacturers make that connection. In this article, we discuss a closed-loop approach to quality that enables cycle-time reduction.
引用
收藏
页码:30 / 32
页数:3
相关论文
共 50 条
  • [1] New product focus in cutting tools
    Cutting Tool Engineering, 1996, 48 (03):
  • [2] New product focus in Cutting Tool Engineering
    Cutting Tool Engineering, 1997, 49 (04):
  • [3] The key to product quality assurance
    Schwemer, WL
    FOOD AND DRUG LAW JOURNAL, 1998, 53 (04) : 627 - 632
  • [4] Modeling of Cutting Forces and Cycle Times for Micromachined Components
    Jayanti, Subramaniam
    Mavuleti, Kalyan
    Becker, Brian
    Erickson, Ethan
    Wadell, Jon
    Marusich, Troy D.
    Usui, Shuji
    Marusich, Kerry
    FIFTH CIRP CONFERENCE ON HIGH PERFORMANCE CUTTING 2012, 2012, 1 : 138 - 143
  • [5] Product quality, incomplete contract and the product cycle
    He, Huanlang
    Yu, Zhihao
    INTERNATIONAL REVIEW OF ECONOMICS & FINANCE, 2018, 53 : 160 - 167
  • [6] Safety and quality key focus at Dalian
    不详
    NAVAL ARCHITECT, 2004, : 52 - 52
  • [7] Design for quality based on product key quality characteristics
    He, Yihai
    Tang, Xiaoqing
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2007, 28 (06): : 1468 - 1481
  • [8] Sound quality evaluation in the product cycle
    Keiper, W
    ACUSTICA, 1997, 83 (05): : 784 - 788
  • [9] A chemical product design course with a quality focus
    Saraiva, PM
    Costa, R
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2004, 82 (A11): : 1474 - 1484
  • [10] Exploring product complexity and prototype lead-times to predict new product development cycle-times
    Solarte Bolanos, Ruben Dario
    Macedo Barbalho, Sanderson Cesar
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 235