Economic Analysis for Small Hydroelectric Power Plant using Extended Multi-Index Methodology - An Approach Stochastic by the Monte Carlo Simulation

被引:9
|
作者
Caricimi, R. [1 ]
Lima, J. D. [2 ]
机构
[1] Univ Tecn Fed Parana, Prod Mecan, Campus Pato Branco, Apucarana, Brazil
[2] Univ Tecn Fed Parana, PPGEPS, Campus Pato Branco, Apucarana, Brazil
关键词
Small Hydroelectric Power Plant; Economic Analysis; Approach Stochastic; Monte Carlo Simulation;
D O I
10.1109/TLA.2018.8528233
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The estimative about increasing of electric energy consume in the next years has been desperted the interesting of the investors in the branch of electrical power generation, mainly from renewable sources, in which the Small Hydroelectric Power Plant (SHPP) is inserted. In that, an improved economic viability analysis becomes indispensable for investment projects with high value of implantation. For this analysis was used an adherent methodology with the stochastic approach, by Monte Carlo Simulation, called Extended Multi-Index Methodology (MMIA). Especially, this SHPP would have capacity of 7 MW installed, whose production would be sold by contract model ACR and associated of the MRE, as measuring of risk containment, seen that (visto que) the electrical production is not uniform during all periods and also considering the great variability of the others variables. The simulation using the random numbers informs that with an initial investment between R$ 28 million and R$ 35 million, the probability is 81.50% to a NPV between R$ 10 million and R$ 15 million and 10.80% of probability of achieving the NPV bigger than R$ 15 million The biggest NPV has probable value near to R$ 22.58 million. Regarding to the risk, the probability of NPV to be smaller than or equal to R$ 1.46 million is 1%, while that, for this same probability, the excessive loss may reach R$ 0.95 million Other economic indicators of this project are: ROIA equals to 0.99%, the IBC is R$ 1.3492 and the average IRR is 14.13%
引用
收藏
页码:2184 / 2191
页数:8
相关论文
共 50 条
  • [1] ANALYSIS OF AN INVESTMENT PROJECT TO MINIMIZE THE BREAKS OF STOCK WITH THE USE OF MULTI-INDEX METHODOLOGY AND MONTE CARLO SIMULATION
    Greca, Felipe Medeiros
    Barddal, Regiane Larissa
    Ravache, Suelen Cristina
    Silva, Dayane Gomes
    Catapan, Anderson
    Martins, Paulo Fernando
    [J]. REVISTA GEINTEC-GESTAO INOVACAO E TECNOLOGIAS, 2014, 4 (03): : 1092 - 1107
  • [2] Economic analysis of black oat production for grazing and silage using the extended multi-index methodology
    Lizot, Mauro
    de Andrade Junior, Pedro Paulo
    de Lima, Jose Donizetti
    Trentin, Marcelo Goncalves
    Setti, Dalmarino
    [J]. CUSTOS E AGRONEGOCIO ON LINE, 2017, 13 (02): : 141 - 155
  • [3] ANALYSIS OF MULTI-INDEX MONTE CARLO ESTIMATORS FOR A ZAKAI SPDE
    Reisinger, Christoph
    Wang, Zhenru
    [J]. JOURNAL OF COMPUTATIONAL MATHEMATICS, 2018, 36 (02) : 202 - 236
  • [4] Economic feasibility study of the implementation of a waste recycling plant construction in Pato Branco city, Parana, using the multi-index methodology extended
    Pais Gularte, Luis Carlos
    de Lima, Jose Donizetti
    Oliveira, Gilson Adamczuk
    Trentin, Marcelo Goncalves
    Setti, Dalmarino
    [J]. ENGENHARIA SANITARIA E AMBIENTAL, 2017, 22 (05) : 985 - 992
  • [5] MULTI-INDEX SEQUENTIAL MONTE CARLO METHODS FOR PARTIALLY OBSERVED STOCHASTIC PARTIAL DIFFERENTIAL EQUATIONS
    Jasra, Ajay
    Law, Kody J. H.
    Xu, Yaxian
    [J]. INTERNATIONAL JOURNAL FOR UNCERTAINTY QUANTIFICATION, 2021, 11 (03) : 1 - 25
  • [6] Monte Carlo simulation approach for a modified FMECA in a power plant
    Bevilacqua, M
    Braglia, M
    Gabbrielli, R
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2000, 16 (04) : 313 - 324
  • [7] Techno-economic analysis and Monte Carlo simulation for green hydrogen production using offshore wind power plant
    Jang, Dohyung
    Kim, Kilwon
    Kim, Kyong-Hwan
    Kang, Sanggyu
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2022, 263
  • [8] MONTE CARLO SIMULATION USED FOR NUCLEAR POWER PLANT ECONOMIC EVALUATIONS.
    Hoge, J.B.
    [J]. 1600, (23):
  • [9] Hydrological uncertainty analysis using Monte Carlo simulations to determine power purchasing agreements for small hydroelectric powerplants
    Alfaica, Ajumar Omar
    Rampinelli, Cassio Guilherme
    Tiago Filho, Geraldo Lucio
    Barros, Regina Mambeli
    dos Santos, Ivan Felipe Silva
    [J]. RENEWABLE ENERGY, 2023, 219
  • [10] Viability of Eucalyptus grandis for firewood production: an analysis using the multi-index methodology
    Strapasson, Fernanda
    Pavloski, Rafaela Plantes
    Moreira, Angela Sobota
    Amaro, Hugo Dias
    Souza, Alceu
    [J]. CUSTOS E AGRONEGOCIO ON LINE, 2018, 14 (01): : 276 - 297