共 50 条
- [3] Research on Improvement of C2 Signal Alarm in Nuclear Instrument System of PWR Nuclear Power Plant NEW ENERGY POWER GENERATION AUTOMATION AND INTELLIGENT TECHNOLOGY, VOL 2, 2024, 1250 : 282 - 290
- [4] Research On Electromagnetic Compatibility and Electronic Compatibility Standard of Instrument Control Equipment in Nuclear Power Plant PROCEEDINGS OF THE 2016 INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (IFEESD), 2016, 75 : 1106 - 1110
- [5] Research on Fault Diagnosis of Secondary Processing Circuit of Temperature Measuring Instrument in Nuclear Power Plant NEW ENERGY POWER GENERATION AUTOMATION AND INTELLIGENT TECHNOLOGY, SICPNPP 2024, VOL 1, 2024, 1249 : 395 - 405
- [6] Research on Implementation Strategy of Overall Refurbishment of Digital Instrument Control System in Nuclear Power Plant NEW ENERGY POWER GENERATION AUTOMATION AND INTELLIGENT TECHNOLOGY, VOL 2, 2024, 1250 : 103 - 113
- [7] Research on KRT Monitoring Instrument Alarm Threshold in Main Control Room of Nuclear Power Plant 2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 4022 - 4025
- [8] Reliability research of nuclear power plant operators through nuclear power plant simulator Hedongli Gongcheng/Nuclear Power Engineering, 2000, 21 (01): : 68 - 71