Responsive human resource framework for design and building of mega housing development projects in Egypt

被引:2
|
作者
Khodeir, Laila Mohamed [1 ]
Nabawy, E. Mohamed [2 ,3 ]
机构
[1] Ain Shams Univ, Fac Engn, Dept Architecture, Project Management & Sustainable Dev, Cairo, Egypt
[2] British Univ Egypt, Cairo, Egypt
[3] London South Bank Univ, Sch Built Environm & Architecture, London, England
关键词
Mega Housing Development Projects (MHDP); Design and Build (DB); Human Resource (HR); Project Management (PM);
D O I
10.1016/j.asej.2020.09.025
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Design and building of Mega Housing Development Projects (MHDP) has become one of the targets of developed countries, due to their positive impact on continuous population growth, rapid urbanisation, economic situation and working force engagement. Developing countries are moving towards the establishment of MHDP, where Egypt 2030 plan aims at constructing MHDP with specific vision. Although MHDP are expected to offer HR opportunities, they will generate challenges. The purpose of this paper is to design a responsive framework to HR factors arising from the internal and external MHDP environments. The paper undergoes a review for HR challenges and opportunities in design and building of MHDP, which was followed by a qualitative analysis of case studies from countries near to Egypt. Finally, a survey questionnaire was implemented, targeting stakeholders involved in MHDP. Most external challenges facing developing countries included security for HR working in design and building, shortage in access to technology in supply from a country to organization, Governance instability systems and lack of coordination. The most challenging factors facing the developing countries include providing services for organizations during construction of new MHDP, planning more flexible funding strategies for more flexible economic construction environment, avoiding continuous change of governmental systems and biased decision making, improving educational knowledge for constructions' obstacles to improve innovation, and Engaging more employees into the construction of MHDP activities. The paper developed a responsive framework and a risk register which better suits MHDP in Egypt. Strategies for HR internal opportunities at the design stage included "exploit", "share", and "enhance". "Exploit" strategy aims to ensure that the opportunity is recognized and make the opportunity definitely happen. Regarding HR Challenges, responsive strategies include "Avoid", "Transfer", "Mitigate", or "Accept". The paper improves management practice of challenges and opportunities for HR in MHDP in Egypt. (C) 2020 The Authors. Published by Elsevier B.V. on behalf of Faculty of Engineering, Ain Shams University.
引用
收藏
页码:2371 / 2383
页数:13
相关论文
共 50 条
  • [1] Risk identification framework in construction of Egyptian mega housing projects
    Nabawy, Mohamed
    Ofori, George
    Morcos, Maged
    Egbu, Charles
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (02) : 2047 - 2056
  • [2] THE ROLE OF MEGA PROJECTS IN REDEFINING HOUSING DEVELOPMENT IN GULF CITIES
    Wiedmann, Florian
    Salama, Ashraf M.
    Ibrahim, Hatem G.
    [J]. OPEN HOUSE INTERNATIONAL, 2016, 41 (02) : 56 - 63
  • [3] Risks assessment using structural equation modeling: mega housing projects construction in Egypt
    Mohamed, Ahmed Gouda
    Ammar, Mohamed Helmy
    Nabawy, Mohamed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (16) : 2717 - 2728
  • [4] Investigating the relationship between human resource development and quality in building projects
    Abdolahi, Mohammad Javad
    Barmayehvar, Behnod
    Marjani, Taimoor
    Esmaeilabadi, Reza
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2023, 28 (02) : 260 - 271
  • [5] Prioritization of Human Resource Development Criteria on Success Indicators in Building Projects
    Abdolahi, Mohammad Javad
    Barmayehvar, Behnod
    Marjani, Taimoor
    Esmaeilabadi, Reza
    [J]. INTERNATIONAL JOURNAL OF ASIAN BUSINESS AND INFORMATION MANAGEMENT, 2024, 15 (01) : 1 - 15
  • [6] A Framework to Adopt Modern Methods of Construction in Social Housing Projects in Egypt
    Bakhaty, Yamen
    Udeaja, Chika
    Levatti, Hector U.
    [J]. SUSTAINABILITY, 2024, 16 (17)
  • [7] A human resource evaluation toolkit for mega size industrial projects
    Homayounfard, Haniyeh
    Safakish, Gholamreza
    [J]. PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 209 - 217
  • [8] HOUSING AND HUMAN RESOURCE DEVELOPMENT
    BURNS, LS
    TJIOE, BK
    [J]. JOURNAL OF THE AMERICAN INSTITUTE OF PLANNERS, 1968, 34 (06): : 396 - 401
  • [9] Improving professional development through building contract administration (BCA) framework of housing projects for graduate architects
    Tiew, Si Yee
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,