Price Adjustment Clauses and Submitted Bid Prices for Major Asphalt Line Items in Highway Projects

被引:16
|
作者
Ilbeigi, M. [1 ]
Ashuri, B. [2 ,3 ]
Shayegh, S. [4 ]
机构
[1] Georgia Inst Technol, Sch Bldg Construct, Econ Sustainable Built Environm ESBE Lab, 280 Ferst Dr, Atlanta, GA 30332 USA
[2] Georgia Inst Technol, Sch Bldg Construct, Sch Civil & Environm Engn, Construct Res Ctr, 280 Ferst Dr, Atlanta, GA 30332 USA
[3] Georgia Inst Technol, Sch Bldg Construct, Sch Civil & Environm Engn, Econ Sustainable Built Environm ESBE Lab, 280 Ferst Dr, Atlanta, GA 30332 USA
[4] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, 765 Ferst Dr, Atlanta, GA 30332 USA
关键词
Price adjustment clause; Asphalt; Bid price; Regression analysis; Quantitative methods; REGRESSION;
D O I
10.1061/(ASCE)CO.1943-7862.0001097
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Unprecedented uncertainty in the price of asphalt cement over the last decade has been a source of major concern for state departments of transportation (state DOTs) and highway contractors. This uncertainty may lead to price speculation and inflated bid prices by highway contractors, in order to secure their financial positions against possible rising prices. One of the most common risk-sharing strategies widely used by transportation agencies is price adjustment clauses (PACs) that shift potential upside and downside risk of material prices from contractors to owners. PACs are aimed at eliminating extra risk premiums and therefore reducing contractors' submitted bid prices. However, the actual effect of offering PACs on submitted bid prices for major asphalt line items has not been empirically studied. The research objective of this paper is to examine the effect of PACs offered by state DOTs on the variations of contractors' submitted bid prices for major asphalt line items. Data on 841 transportation projects were collected and several potential explanatory variables, such as duration of the project, asphalt cement price index, number of bidders, and eligibility for the PAC program were identified. Multivariate regression analysis was used to create appropriate statistical models that can explain the variations of contractors' submitted bid prices for five major asphalt line items. The results indicate that eligibility for the PAC program was not a statistically significant variable in most of the models. Thus, no evidence was found to support the statement that offering PACs would reduce the submitted bid prices. It is expected that this work will help capital planners of transportation agencies enhance their understandings about important variables affecting submitted bid prices for highway projects. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 8 条
  • [1] Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects
    Baek, M.
    Ashuri, B.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [2] Effects of Price-Adjustment Clauses on Number of Bidders and Dispersion of Bid Prices in Highway Construction
    Ilbeigi, M.
    Castro-Lacouture, D.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (04)
  • [3] Correlating the quantity and bid cost of unit price items for public road projects
    Pramen P. Shrestha
    Nipesh Pradhananga
    Nirajan Mani
    [J]. KSCE Journal of Civil Engineering, 2014, 18 : 1590 - 1598
  • [4] Correlating the quantity and bid cost of unit price items for public road projects
    Shrestha, Pramen P.
    Pradhananga, Nipesh
    Mani, Nirajan
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (06) : 1590 - 1598
  • [5] A Critical Assessment of Material Price Adjustment Clauses for Transportation Design-Build Projects
    Thu, Moe Kyaw
    Hamilton, Parker
    Lee, Jung Hyun
    Kingsley, Gordan
    Ashuri, Baabak
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (03)
  • [6] Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
    Kim, Kyong Ju
    Kim, Deok Soo
    Kim, Kyoungmin
    Kim, Eu Wang
    Shin, Yeon Ju
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (08) : 3091 - 3097
  • [7] The intraday speed of stock price adjustment to major dividend changes: Bid-ask bounce and order flow imbalances
    Gosnell, TF
    Keown, AJ
    Pinkerton, JM
    [J]. JOURNAL OF BANKING & FINANCE, 1996, 20 (02) : 247 - 266
  • [8] Examining the Impact of COVID-19 on Unit Bid Price of Reclaimed Asphaltic Concrete Items Regarding Georgia Highway Maintenance Project through Change Point Detection
    Paik, Yejee
    Li, Mingshu
    Ashuri, Baabak
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 299 - 308